BLD08-01430
| BLD-Framing/Rough-in | 11/6/2008 | 11/6/2008 | 11/6/2008 4:51:41 PM | P | FAIL |
|
|
bruce Phone #: ###-#### interior wall fire blocks,, part ok but need horizontal 10 ft and ceiling lines as needed,, can use fiberglass insulation,, will re sched in am
|
ESC08-00964
| Site Preparation | 11/6/2008 | 11/6/2008 | 11/6/2008 4:47:47 PM | P | PART |
|
|
will sweep pad at end of day,, will get wash out area soon,, conf on job
|
BLD08-02303
| BLD-Footing | 11/6/2008 | 11/6/2008 | 11/6/2008 4:25:47 PM | P | PART |
|
|
BRODIE Phone #: ###-#### poured,, appears ok,, 4 posts ftgs
|
BLD08-02277
| BLD-Conference | 11/6/2008 | 11/6/2008 | 11/6/2008 4:11:03 PM | P | PART |
|
|
tim Phone #: ###-#### ok to use exception in code on smoke detectors,, do not have to hook 3 detectors to upstairs s/d
|
BLD08-02210
| BLD-Framing/Rough-in | 11/6/2008 | 11/6/2008 | 11/6/2008 3:43:25 PM | P | FAIL |
|
|
nat Phone #: ###-#### c/n posted,, do not insulate
|
ESC08-00820
| Site Preparation | 11/6/2008 | 11/6/2008 | 11/6/2008 2:33:35 PM | P | PART |
|
|
will need a clean out area,, garage ok for now,, will go back in a couple days
|
ESC08-00386
| Site Preparation | 11/6/2008 | 11/6/2008 | 11/6/2008 2:28:18 PM | P | DONE |
|
|
|
ESC08-00386
| Site Final | 11/6/2008 | 11/6/2008 | 11/6/2008 2:28:08 PM | P | PASS |
|
|
demo complete
|
BLD08-00939
| BLD-Final | 11/5/2008 | 11/6/2008 | 11/6/2008 2:26:47 PM | A | PASS |
|
|
cory Phone #: ###-####
|
BLD08-00939
| DOC - Permit Finaled | 11/6/2008 | 11/6/2008 | 11/6/2008 2:26:16 PM | P | PASS |
|
|
all gone
|
BLD08-02052
| BLD-Footing | 11/6/2008 | 11/6/2008 | 11/6/2008 1:27:43 PM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 11/6/2008 at 7:11:38 AM. Contact: ###-####.
|
BLD08-02351
| BLD-Footing | 11/5/2008 | 11/6/2008 | 11/6/2008 12:15:16 PM | A | PART |
|
|
Josh- late AM Please Phone #: ###-#### wip
|
BLD08-01462
| BLD-Energy code compliance | 11/5/2008 | 11/6/2008 | 11/6/2008 11:11:13 AM | A | PASS |
|
|
don - ok to cover Phone #: ###-####
|