Inspections for the day of: Thursday, November 6, 2008.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD08-01941 FIRE-Final Inspection11/6/200811/6/200811/7/2008 1:27:50 PMPPASS
Life safety passed
FIR08-00551 INSP-Sprinkler Rough-in11/6/200811/6/200811/7/2008 8:44:30 AMPPASS
The 24 hr air test was started with 41 1/14 psi on the guage.
BLD08-00601 FIRE-Final Inspection11/6/200811/6/200811/6/2008 1:35:52 PMPCANC
To be rescheduled for tomorrow.
FIR08-00563 INSP-Sprinkler Rough-in/Hydro11/5/200811/6/200811/6/2008 12:00:43 PMAFAIL
All items have been corrected except for the insulation is still causing obstructions to the upright sprinkler protection. I stopped at the project twice today.
BLD08-00708 FIRE-Final Inspection11/5/200811/6/200811/6/2008 10:30:18 AMAFAIL
I stopped by the job site twice and called twice but greg was not available. No inspection was performed.
FIR08-00299 INSP-Sprinkler Rough-in11/5/200811/6/200811/6/2008 9:23:15 AMAPASS
See the city approved plans for areas where the sprinkler piping can be installed.