BLD08-01941
| FIRE-Final Inspection | 11/6/2008 | 11/6/2008 | 11/7/2008 1:27:50 PM | P | PASS |
|
|
Life safety passed
|
FIR08-00551
| INSP-Sprinkler Rough-in | 11/6/2008 | 11/6/2008 | 11/7/2008 8:44:30 AM | P | PASS |
|
|
The 24 hr air test was started with 41 1/14 psi on the guage.
|
BLD08-00601
| FIRE-Final Inspection | 11/6/2008 | 11/6/2008 | 11/6/2008 1:35:52 PM | P | CANC |
|
|
To be rescheduled for tomorrow.
|
FIR08-00563
| INSP-Sprinkler Rough-in/Hydro | 11/5/2008 | 11/6/2008 | 11/6/2008 12:00:43 PM | A | FAIL |
|
|
All items have been corrected except for the insulation is still causing obstructions to the upright sprinkler protection. I stopped at the project twice today.
|
BLD08-00708
| FIRE-Final Inspection | 11/5/2008 | 11/6/2008 | 11/6/2008 10:30:18 AM | A | FAIL |
|
|
I stopped by the job site twice and called twice but greg was not available. No inspection was performed.
|
FIR08-00299
| INSP-Sprinkler Rough-in | 11/5/2008 | 11/6/2008 | 11/6/2008 9:23:15 AM | A | PASS |
|
|
See the city approved plans for areas where the sprinkler piping can be installed.
|