Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC09-00521 BMP Violation11/5/200911/6/200911/6/2009 2:50:41 PMPPASS
ESC09-00470 Tracking Control11/6/200911/6/200911/6/2009 2:08:12 PMPFAIL
Message to RP:
Maintain construction entrance with a top dressing of 2" or greater washed rock. Clean up any track that occurs off of construction exit. Will re-inspect on 11/09/09 PM.
ESC09-00507 Random Inspection11/4/200911/6/200911/6/2009 1:55:22 PMPPASS
ESC09-00543 BMP Violation11/4/200911/6/200911/6/2009 10:43:34 AMAPASS
ESC09-00687 Site Preparation11/6/200911/6/200911/6/2009 10:37:44 AM PART
Verbal to RP:When not pulling from sand pile keep the sediment barrier surrounding it.
ESC09-00685 Site Preparation ESC11/6/200911/6/200911/6/2009 10:22:09 AM PASS
ESC09-00686 Site Preparation ESC11/6/200911/6/200911/6/2009 8:21:35 AM NR
Will be cotacted by the RP to go over requirements and condition of the work being completed for the removal and placement of the basketball courts. Will re-inspect once contacted by the RP or no later than 11/12/09AM.
ESC09-00684 Site Preparation ESC11/6/200911/6/200911/6/2009 8:11:15 AM PASS
ESC09-00386 Site Preparation10/30/200911/6/200911/2/2009 2:15:49 PMACANC
Contacted RP to find out the start date. It is tenitive date 2 week from today the 11/2/09. Will re-inspect on 11/16/09AM