BLD12-01193
| FIRE-Final Inspection | 11/5/2012 | 11/6/2012 | 11/7/2012 12:56:09 PM | P | PART |
|
|
Fire life safety inspection completed. Noted items include adjustments at directional exit signage, post two additional extinguishers, provide missing exit discharge light at the NE exit, relocate refrigerant alarm signage, provide EM lighting at the immediate vicinity of the north main exit, post max occupant load sign at the 2nd floor bar area, provide approved style hardware at two sliding cooler doors.
|
FIR12-00578
| INSP-Sprinkler Rough-in | 11/6/2012 | 11/6/2012 | 11/6/2012 2:36:47 PM | P | PART |
|
|
Overhead modifications and rough-in at the new office areas okayed.
|
FIR12-00579
| INSP-Sprinkler Rough-in | 11/6/2012 | 11/6/2012 | 11/6/2012 2:28:50 PM | P | PART |
|
|
Overhead work at the new office areas approved for cover.
|
BLD12-01806
| FIRE-Final Inspection | 11/5/2012 | 11/6/2012 | 11/6/2012 2:27:42 PM | A | PASS |
|
|
Items on the correction notice have been finished with the exception of door hardware at the second exit. Tenant to repair prior to structural final as agreed. Life safety passed.
|
FIR12-00625
| INSP-Sprinkler Rough-in | 11/5/2012 | 11/6/2012 | 11/6/2012 2:21:02 PM | A | PART |
|
|
See dated plan annotations for notes- common corridor missing one pendent head where grid ceiling is not installed, relocate one head adjacent to wall and finishes, basement storage room spacing needs revised, one blocked head due to new drain piping. Basement cooler and first floor kitchen area grid ceilings and heads are incomplete at this time. Okay to cover modifications above sheetrock ceilings.
|