ESC11-00253
| Site Final | 11/6/2012 | 11/6/2012 | 11/6/2012 12:00:00 AM | A | PASS |
|
|
|
ESC12-00077
| General Inspection | 11/6/2012 | 11/6/2012 | 11/6/2012 12:00:00 AM | A | PASS |
|
|
RP called to notify City that stabilization has been performed in the inactive portions of the site. Verified during site inspection.
|
ESC12-00403
| Conference | 11/6/2012 | 11/6/2012 | 11/6/2012 12:00:00 AM | A | PASS |
|
|
Conference requested to approve on site dewatering system. Scheduled for 2 PM. Dewatering swale approved for use.
|