GCB13-00113
| GCB-Fndatn/slab ins/fld vent | 11/6/2013 | 11/6/2013 | 11/7/2013 1:48:41 PM | P | PASS |
|
|
Shawn ###-####
|
BLD13-02626
| BLD-Framing/Rough-in | 11/6/2013 | 11/6/2013 | 11/6/2013 3:08:44 PM | P | PASS |
|
|
on the roof of the band choir on the West side of the building // Russ Phone #: ###-####
|
BLD13-02795
| BLD-Conference | 11/6/2013 | 11/6/2013 | 11/6/2013 3:07:34 PM | P | DONE |
|
|
micah Phone #: ###-####
|
BLD13-02794
| BLD-Footing | 11/5/2013 | 11/6/2013 | 11/6/2013 3:06:28 PM | P | PART |
|
|
ryan Phone #: ###-#### Not Quite done...Appears OK
|
BLD13-03044
| BLD-Final | 11/5/2013 | 11/6/2013 | 11/6/2013 12:49:41 PM | A | PASS |
|
|
Shawn Phone #: ###-####
|
BLD13-03044
| DOC - Permit Finaled | 11/6/2013 | 11/6/2013 | 11/6/2013 12:49:28 PM | P | PASS |
|
|
|
BLD12-00599
| BLD-Framing/Rough-in | 11/5/2013 | 11/6/2013 | 11/6/2013 12:49:04 PM | A | PART |
|
|
Laura-Please call at least 30 mins prior to inspection Phone #: ###-#### C/N left on site.....OK to insul.......
|
BLD13-02473
| BLD-Framing/Rough-in | 11/5/2013 | 11/6/2013 | 11/6/2013 12:48:10 PM | A | PART |
|
|
David-Please call for access information Phone #: ###-#### C/N Arch to verify 1hr walls thru-out? Eng to approve additional loading on trusses.
|
BLD13-01732
| BLD-Framing/Rough-in | 11/5/2013 | 11/6/2013 | 11/6/2013 12:06:20 PM | A | PART |
|
|
mike Phone #: ###-#### C/N posted. OK to insulate.
|
BLD13-02278
| BLD-Framing/Rough-in | 11/5/2013 | 11/6/2013 | 11/6/2013 9:54:21 AM | A | PASS |
|
|
curt Phone #: ###-####
|