ESC11-00879
| General Inspection | 11/6/2013 | 11/6/2013 | 11/6/2013 1:48:34 PM | | PART |
|
|
Called Cameron via cell and left voicemail. entire site needs the streets swept, trackout occuring throughout site. Also, designated concrete washout needs to be a dug pit. Currently washing out ontop of ground, in which the wash water is migrating all over the surface ground. Will reinspect tomorrow afternoon 11-7-13
|
ESC13-00764
| General Inspection | 11/6/2013 | 11/6/2013 | 11/6/2013 12:49:45 PM | | FAIL |
|
|
Called Collin Connell to discuss issues with lack of BMP Maintanence. He stated it was from a water truck. Sweep Sediment off sidewalk, roads, remove witches hats and replace new or clean bmp. redo construction entrance
|
ESC12-01013
| Aging Inspection | 11/6/2013 | 11/6/2013 | 11/6/2013 11:59:44 AM | | PASS |
|
|
|
ESC12-01193
| Aging Inspection | 11/6/2013 | 11/6/2013 | 11/6/2013 11:47:58 AM | | DONE |
|
|
See Final
|
ESC12-01193
| DOC - Permit Finaled | 11/6/2013 | 11/6/2013 | 11/6/2013 11:47:39 AM | P | PASS |
|
|
Complete No ESC Issues
|
ESC12-01150
| Aging Inspection | 11/6/2013 | 11/6/2013 | 11/6/2013 9:17:46 AM | | DONE |
|
|
See Final
|
ESC12-01150
| DOC - Permit Finaled | 11/6/2013 | 11/6/2013 | 11/6/2013 9:17:14 AM | P | PASS |
|
|
Construction Complete Re-veg Established No ESC Issues
|
ESC13-01071
| Site Preparation | 11/5/2013 | 11/6/2013 | 11/6/2013 8:55:59 AM | A | PASS |
|
|
Kristy-Late am please Phone #: ###-####
|