BLD05-01282
| FIRE-Conference | 10/28/2015 | 11/4/2015 | | A | |
|
|
follow up
|
FIR15-00513
| INSP-Conference | 11/6/2015 | 11/6/2015 | 11/6/2015 1:18:48 PM | P | CANC |
|
|
Jason Phone #: ###-####
|
BLD15-03442
| FIRE-Final Inspection | 11/2/2015 | 11/6/2015 | 11/6/2015 11:25:27 AM | A | PASS |
|
|
Life safety passed
|
FIR15-00649
| INSP-Sprinkler Rough-in | 11/5/2015 | 11/6/2015 | 11/6/2015 8:55:37 AM | A | PASS |
|
|
Second floor bacony piping can be covered.
|
BLD15-00128
| FIRE-Final Inspection | 11/5/2015 | 11/6/2015 | 11/6/2015 8:54:50 AM | A | PART |
|
|
A temporary occupancy for life safety is being given until the scope of work has been complete. Currently the existing building/dealership has not been demolished and the parking lot/fire lane completed. Contractor is hoping with in the next 6 weeks all work will be complete.
|