Inspections for the day of: Monday, November 6, 2017.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR17-00629 INSP-Final Inspection11/3/201711/6/201711/6/2017 3:26:48 PMPFAIL
Hood suppression system functioned correctly but is not connected to the existing fire alarm system. There can be no final sign off until a permit is issued and connection verified.
BLD17-00566 FIRE-Final Inspection11/3/201711/6/201711/6/2017 3:22:19 PMPFAIL
For phase I to be passed I need exit discharge lights at the marked exits and per Carl Westfall a temporary occupant load sign of 49 for Room 106. This will allow only one exit required until the permanent exit path through phase 2 is finished

Phone #: ###-#### Inspection requested via web by John Saucerman
FIR17-00512 INSP-Final Inspection11/3/201711/6/201711/6/2017 3:17:02 PMPPASS
permit finaled
FIR17-00648 INSP-Final Inspection11/6/201711/6/201711/6/2017 3:16:35 PMPPASS
Permit finaled. Horn/strobes have been corrected
FIR17-00648 INSP-Final Inspection11/3/201711/6/201711/6/2017 3:15:54 PMAFAIL
Two ceiling mount horn/strobes are overspaced
FIR17-00545 INSP-Sprinkler Rough-in11/3/201711/6/201711/6/2017 12:15:45 PMACANC
Contact Brad Westbrook ###-#### 30 min. prior to Rough In start please.

Thank You Phone #: ###-#### >> Inspection requested via web by Teri Cruickshank Inspection cancelled from web by: Teri Cruickshank
BLD17-00962 FIRE-Final Inspection11/3/201711/6/201711/6/2017 10:31:09 AMPFAIL
Per the mechanical prints two duct smoke detectors are required. They were not addressed with the fire alarm permit which has been finaled. A new permit is needed.. Address numbers on both sides of the building are needed as well.

Troy Phone #: ###-####
BLD17-02220 FIRE-Final Inspection11/3/201711/6/201711/6/2017 9:42:08 AMAFAIL
Provide single action hardware on the east doors, provide sticker at the north doors, repair the exit signs, remove non-functional devices.

Casandra Phone #: ###-####
FIR17-00527 INSP-Sprinkler Rough-in11/3/201711/6/201711/6/2017 8:36:13 AMAPASS
Rough-in passed. Piping can be covered.