ELE19-01688
| Electrical Rough-In | 11/6/2019 | 11/6/2019 | 11/6/2019 1:47:29 PM | P | PASS |
|
|
Contact is Tony Holt. Rough in inspection for first floor desk. Phone #: ###-#### Inspection requested via web by Scott Campbell First floor deck pour 1 ok to cover
|
ELE19-03489
| Final | 11/6/2019 | 11/6/2019 | 11/6/2019 1:28:18 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Dan Surerus 210.70A2(3) There shall be a wall switch at each floor level with outside entry where the stairway between has 6 treads or more. (Stairwell)
|
ELE19-04270
| Electrical Rough-In | 11/6/2019 | 11/6/2019 | 11/6/2019 1:00:36 PM | P | PASS |
|
|
There will be someone home. If you have any questions, please feel free to contact Chaz ###-####. Thanks!!!! Phone #: ###-#### Inspection requested via web by Clayton Morgan Hall d Master bath ok to cover.
|
ELE19-04117
| Rough-In Permanent Service | 11/6/2019 | 11/6/2019 | 11/6/2019 12:29:13 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by JENNY EMEL equipment rough in ok. Sub panel grounds have been separated. Not adding circuits to split bus. Just refeeding it from 100A disc. p/s u/g rec ok
|
ELE19-03105
| Final | 11/5/2019 | 11/6/2019 | 11/6/2019 11:21:19 AM | A | PASS |
|
|
Bldg. 80 mothers room. Phone #: ###-#### Inspection requested via web by Steve Moss Final ok
|
ELE19-03910
| Electrical Rough-In | 11/6/2019 | 11/6/2019 | 11/6/2019 10:39:52 AM | P | CANC |
|
|
Someone will be there. Call Chaz with any questions ###-#### Phone #: ###-#### >> Inspection requested via web by Clayton Morgan Inspection cancelled from web by: Clayton Morgan
|
ELE19-02553
| Final | 11/5/2019 | 11/6/2019 | 11/6/2019 10:33:34 AM | A | PASS |
|
|
Bldg. 80 upper dock bathroom remodel. Phone #: ###-#### Inspection requested via web by Steve Moss Final ok
|
ELE19-04263
| Electrical Rough-In | 11/6/2019 | 11/6/2019 | 11/6/2019 10:32:36 AM | A | PASS |
|
|
We will be on site around 8 30 with material and should be there all morning. Phone #: ###-#### Inspection requested via web by Matt Oranday Listing of panels and Micro inverters ok.
|
ELE19-04095
| Final | 11/4/2019 | 11/6/2019 | 11/6/2019 9:52:21 AM | A | PASS |
|
|
Mierins Rozentals is the on site contact Phone #: ###-#### Inspection requested via web by BRS Permitting Final ok
|
ELE19-03759
| Electrical Rough-In | 11/5/2019 | 11/6/2019 | 11/6/2019 9:29:43 AM | A | PASS |
|
|
Bonding/Rough-In Inspection Phone #: ###-#### Inspection requested via web by Steven Ragan eq bond ok to cover
|
ELE19-02354
| Electrical Rough-In | 11/6/2019 | 11/6/2019 | 11/6/2019 8:57:32 AM | A | PASS |
|
|
Master Bathroom floor heat. garage code. 5706 Phone #: ###-#### Inspection requested via web by Neal Rumsey floor heat only ok
|