PLM95-00527
| INSP - Final | 11/6/1995 | 11/7/1995 | 11/7/1995 12:00:00 AM | A | PASS |
|
|
11/06/95 330 - THE R/I DOESN'T SHOW THAT IT WAS DONE ON THE COMPUTER 3-wc,3-lav,3-tub,1-si,1-wb,1-wh
|
PLM95-01023
| INSP - Ground work | 11/6/1995 | 11/7/1995 | 11/7/1995 12:00:00 AM | A | PART |
|
|
11/06/95 330 - WATER LINE this inspection is for the discharge line from the efluent tank its a pa , from the tank twards the tie-in 90'. the test failed, they have the op of retestg now or testing the line when its complete. left notice. there to be
|
PLM95-01606
| INSP - Sewer and Water lines | 11/6/1995 | 11/7/1995 | 11/7/1995 12:00:00 AM | A | PASS |
|
|
11/06/95 330 - READY BY 10:00
|
PLM95-01611
| INSP - Plumbing Rough-in | 11/7/1995 | 11/7/1995 | 11/7/1995 12:00:00 AM | P | PASS |
|
|
11/07/95 330 - 9 FIXTURES
|
PLM95-01613
| INSP - Plumbing Rough-in | 11/7/1995 | 11/7/1995 | 11/7/1995 12:00:00 AM | P | PASS |
|
|
11/07/95 330 - 3 W/C 5 LAV 3 TUB 2 SINK 1 W/B 1 W/H
|
PLM95-01456
| INSP - Sewer line | 11/7/1995 | 11/7/1995 | 11/7/1995 12:00:00 AM | P | PASS |
|
|
11/07/95 330 -
|
PLM95-01591
| INSP - Water lines | 11/7/1995 | 11/7/1995 | 11/7/1995 12:00:00 AM | P | PASS |
|
|
11/07/95 330 - REINSPECTION ON WATER ONLY
|