BLD00-02360
| BLD-Framing/Rough-in | 11/6/2000 | 11/7/2000 | 11/7/2000 12:00:00 AM | A | PASS |
|
|
###-####
|
BLD99-01359
| BLD-Framing/Rough-in | 11/6/2000 | 11/7/2000 | 11/7/2000 12:00:00 AM | A | FAIL |
|
|
Ron Alexander, ###-#### collor ties at over build / seal top plate on wood framing/ ok to insulate / mech reinsp or stay out of the water heater area for part cover upon reinsp. 11/7/2000 11:22:38 AM
|
BLD00-02655
| BLD-Framing/Rough-in | 11/6/2000 | 11/7/2000 | 11/7/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 11/06/2000 at 12:18:39. Contact: ###-####. c/n no massanary insp. need lentals over doors or engineer to justify as well as special insp report to comply. truss bracing not complet. soler tube framing and hardware not in place. 11/7/2000 10:28:12 AM
|
BLD99-01727
| BLD-Energy code compliance | 11/6/2000 | 11/7/2000 | 11/7/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 11/06/2000 at 15:45:52. Contact: ###-####. 3rd floor ok for cover 2nd and first ok to insulate. 11/7/2000 11:49:45 AM
|
MIS00-00258
| BLD-Final | 11/7/2000 | 11/7/2000 | 11/7/2000 12:00:00 AM | P | PASS |
|
|
###-####
|
MIS00-00259
| BLD-Final | 11/7/2000 | 11/7/2000 | 11/7/2000 12:00:00 AM | P | PASS |
|
|
###-####
|
BLD00-00662
| BLD-Conference | 11/7/2000 | 11/7/2000 | 11/7/2000 12:00:00 AM | P | PASS |
|
|
FOR CONF-- WARREN-- ###-#### need nail to stapple converition. 11/7/2000 3:27:36 PM
|
BLD00-00740
| BLD-Final | 11/7/2000 | 11/7/2000 | 11/7/2000 12:00:00 AM | P | PART |
|
|
Ernie ###-#### final ok pending fire and plm sign off. 11/7/2000 4:25:51 PM
|
BLD99-02185
| BLD-Framing/Rough-in | 11/7/2000 | 11/7/2000 | 11/7/2000 12:00:00 AM | P | FAIL |
|
|
Wes ###-#### colums at mech. mez. not wrapped/ ele putty pads required at center coridor north / south coridor blow patch. 11/8/2000 8:52:39 AM
|
BLD99-02049
| BLD-Final | 11/6/2000 | 11/7/2000 | 11/7/2000 12:00:00 AM | P | FAIL |
|
|
FN TOM ###-#### c/n isued 4 hr p/l protection not complet. ok for temp upon completion of this isue. other isues can be completed on temp occ time frame. 11/7/2000 3:16:07 PM
|
BLD00-01563
| BLD-Concrete | 11/6/2000 | 11/7/2000 | 11/7/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 11/06/2000 at 07:58:12. Contact: ###-####. placed w/si p. report on site walk through and spoke w s/i ok having sch meeting. 11/7/2000 5:28:38 PM
|