Inspections for the day of: Tuesday, November 7, 2000.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Storey
TitleBLD-COM/RES INSPECTOR
Phone #794-9490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-02360 BLD-Framing/Rough-in11/6/200011/7/200011/7/2000 12:00:00 AMAPASS
###-####
BLD99-01359 BLD-Framing/Rough-in11/6/200011/7/200011/7/2000 12:00:00 AMAFAIL
Ron Alexander, ###-#### collor ties at over build / seal top plate on wood framing/ ok to insulate / mech reinsp or stay out of the water heater area for part cover upon reinsp. 11/7/2000 11:22:38 AM
BLD00-02655 BLD-Framing/Rough-in11/6/200011/7/200011/7/2000 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 11/06/2000 at 12:18:39. Contact: ###-####. c/n no massanary insp. need lentals over doors or engineer to justify as well as special insp report to comply. truss bracing not complet. soler tube framing and hardware not in place. 11/7/2000 10:28:12 AM
BLD99-01727 BLD-Energy code compliance11/6/200011/7/200011/7/2000 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 11/06/2000 at 15:45:52. Contact: ###-####. 3rd floor ok for cover 2nd and first ok to insulate. 11/7/2000 11:49:45 AM
MIS00-00258 BLD-Final11/7/200011/7/200011/7/2000 12:00:00 AMPPASS
###-####
MIS00-00259 BLD-Final11/7/200011/7/200011/7/2000 12:00:00 AMPPASS
###-####
BLD00-00662 BLD-Conference11/7/200011/7/200011/7/2000 12:00:00 AMPPASS
FOR CONF-- WARREN-- ###-#### need nail to stapple converition. 11/7/2000 3:27:36 PM
BLD00-00740 BLD-Final11/7/200011/7/200011/7/2000 12:00:00 AMPPART
Ernie ###-#### final ok pending fire and plm sign off. 11/7/2000 4:25:51 PM
BLD99-02185 BLD-Framing/Rough-in11/7/200011/7/200011/7/2000 12:00:00 AMPFAIL
Wes ###-#### colums at mech. mez. not wrapped/ ele putty pads required at center coridor north / south coridor blow patch. 11/8/2000 8:52:39 AM
BLD99-02049 BLD-Final11/6/200011/7/200011/7/2000 12:00:00 AMPFAIL
FN TOM ###-#### c/n isued 4 hr p/l protection not complet. ok for temp upon completion of this isue. other isues can be completed on temp occ time frame. 11/7/2000 3:16:07 PM
BLD00-01563 BLD-Concrete11/6/200011/7/200011/7/2000 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 11/06/2000 at 07:58:12. Contact: ###-####. placed w/si p. report on site walk through and spoke w s/i ok having sch meeting. 11/7/2000 5:28:38 PM