ELE00-03383
| Final | 11/6/2000 | 11/7/2000 | 11/7/2000 12:00:00 AM | A | PASS |
|
|
Steve ###-#### the garage door opener is 7890 if the door is locked. completed. 11/7/2000 11:34:35 AM
|
ELE00-04303
| Temporary Service | 11/6/2000 | 11/7/2000 | 11/7/2000 12:00:00 AM | A | PASS |
|
|
Steve ###-####. temporary service pole. 11/7/2000 11:35:20 AM
|
ELE00-04304
| Temporary Service | 11/6/2000 | 11/7/2000 | 11/7/2000 12:00:00 AM | A | PASS |
|
|
###-####. temporary service pole. 11/7/2000 11:35:52 AM
|
ELE00-02657
| Final | 11/6/2000 | 11/7/2000 | 11/7/2000 12:00:00 AM | A | PASS |
|
|
###-####. completed 11/7/2000 11:36:35 AM
|
ELE00-03400
| Rough-In Permanent Service | 11/6/2000 | 11/7/2000 | 11/7/2000 12:00:00 AM | A | PASS |
|
|
Bob Scott ###-####. ele r/i; perm/svc. service does not include sub-panel (not ready). 11/7/2000 11:38:41 AM
|
ELE00-04305
| Electrical Rough-In | 11/7/2000 | 11/7/2000 | 11/7/2000 12:00:00 AM | P | PASS |
|
|
JIM ###-#### R/I . 3rd floor; walls e/e r/i. 11/7/2000 9:06:32 PM
|
ELE00-04313
| Final | 11/7/2000 | 11/7/2000 | 11/7/2000 12:00:00 AM | P | FAIL |
|
|
KELLY ###-#### FOR HOT TUB. no access; left card, called contractor. will reschedule. 11/7/2000 9:10:21 PM
|
ELE00-02442
| Permanent Service | 11/7/2000 | 11/7/2000 | 11/7/2000 12:00:00 AM | P | PASS |
|
|
arley ###-#### Id power raised the line from the alley to the house yesterday . idaho power relocated service entrance conductors to new service panel. 11/7/2000 9:09:19 PM
|
ELE00-04229
| Temporary Service | 11/7/2000 | 11/7/2000 | 11/7/2000 12:00:00 AM | P | PASS |
|
|
###-####. temporary service pole. 11/7/2000 9:05:35 PM
|
ELE00-04271
| Permanent Service | 11/3/2000 | 11/7/2000 | 11/7/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 11/03/2000 at 07:58:57. Contact: ###-####. perm/svc change. 11/7/2000 9:04:55 PM
|