BLD99-02540
| BLD-Framing/Rough-in | 11/6/2000 | 11/7/2000 | 11/7/2000 12:00:00 AM | A | PASS |
|
|
FOR HOMEOWNER ###-#### MICHAEL-FOR ACCESS NORTH SIDE DOOR ok to sheetrock framing ok.also electrical approved. 11/7/2000 9:55:29 AM
|
BLD00-02548
| BLD-Framing/Rough-in | 11/6/2000 | 11/7/2000 | 11/7/2000 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 11/06/2000 at 11:44:40. Contact: ###-####.need truss det,energy seal.c/n. 11/7/2000 12:58:26 PM
|
MEC00-03729
| Pressure Test | 11/6/2000 | 11/7/2000 | 11/7/2000 12:00:00 AM | A | FAIL |
|
|
call first ###-#### The pressure guage has been removed by the cabinet installer. 11/7/2000 10:05:00 AM
|
BLD00-02446
| BLD-Footing | 11/6/2000 | 11/7/2000 | 11/7/2000 12:00:00 AM | A | PART |
|
|
###-#### footings ok,no string lines up for setbacks appears ok. 11/7/2000 1:37:16 PM
|
MEC00-03819
| Rough-in | 11/6/2000 | 11/7/2000 | 11/7/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 11/06/2000 at 14:25:23. Contact: ###-####.
|
BLD00-02028
| BLD-Framing/Rough-in | 11/6/2000 | 11/7/2000 | 11/7/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 11/06/2000 at 15:36:08. Contact: ###-####.c/n posted. 11/8/2000 9:03:49 AM
|
BLD00-03355
| BLD-Footing | 11/6/2000 | 11/7/2000 | 11/7/2000 12:00:00 AM | A | PART |
|
|
scott ###-#### deck footings appears ok.some poured. 11/8/2000 9:03:06 AM
|
MEC00-01415
| Final | 11/7/2000 | 11/7/2000 | 11/7/2000 12:00:00 AM | A | PASS |
|
|
Joe ###-####
|
BLD00-01803
| BLD-Final | 11/6/2000 | 11/7/2000 | 11/7/2000 12:00:00 AM | P | PART |
|
|
Isabel Bruce ###-#### OK temp,need to resolve tie-down installation with engineer. 11/8/2000 2:22:45 PM
|
BLD00-01648
| BLD-Framing/Rough-in | 11/6/2000 | 11/7/2000 | 11/7/2000 12:00:00 AM | P | FAIL |
|
|
###-####\exterior sheetingc/n posted. 11/8/2000 9:04:57 AM
|
BLD00-02435
| BLD-Framing/Rough-in | 11/6/2000 | 11/7/2000 | 11/7/2000 12:00:00 AM | P | FAIL |
|
|
###-#### 2 item left c/n. 11/8/2000 11:46:55 AM
|
BLD00-02455
| BLD-Other | 11/6/2000 | 11/7/2000 | 11/7/2000 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 11/06/2000 at 17:00:12. Contact: . Disp set to [CANC] by a contractor via Hello! on 11/07/2000 at 08:51:56.
|
BLD00-01063
| BLD-Framing/Rough-in | 11/7/2000 | 11/7/2000 | 11/7/2000 12:00:00 AM | P | FAIL |
|
|
FR INSP-- DAN ###-#### CELL SHEAR WALL allready done. 11/8/2000 9:05:13 AM
|
BLD00-02178
| BLD-Final | 11/7/2000 | 11/7/2000 | 11/7/2000 12:00:00 AM | P | PASS |
|
|
###-####
|
BLD00-02727
| BLD-Energy code compliance | 11/6/2000 | 11/7/2000 | 11/7/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 11/06/2000 at 16:05:06. Contact: ###-####.
|