Inspections for the day of: Tuesday, November 7, 2000.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRick Jackson
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-02571 FIRE-Final Inspection11/7/200011/7/200011/7/2000 12:00:00 AM FAIL
Tim ###-#### requires one exit and they will put exit sign above main door and to remove sign at second door 11/7/2000 2:16:42 PM
FIR00-00536 INSP-Sprinkler Rough-in11/3/200011/7/200011/7/2000 12:00:00 AMAPART
system 2\\\###-#### hydro on system 2 okay; r/i okay with recheck of straps not wrapped around joists in bathroom area 11/7/2000 1:46:09 PM
BLD99-03585 FIRE-Final Inspection11/6/200011/7/200011/7/2000 12:00:00 AMAPASS
###-####
BLD99-02049 FIRE-Final Inspection11/6/200011/7/200011/7/2000 12:00:00 AMAPASS
TOM ###-#### FIRE FN
BLD00-01803 FIRE-Final Inspection11/6/200011/7/200011/7/2000 12:00:00 AMAPASS
Modular C Isabel Bruce ###-####
FIR00-00418 INSP-Sprinkler Rough-in/Hydro11/7/200011/7/200011/7/2000 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 11/07/2000 at 08:17:43. Contact: ###-####. will reschedule for 11/9 11/7/2000 4:07:56 PM
FIR00-00527 INSP-Supply line flush11/7/200011/7/200011/7/2000 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 11/07/2000 at 09:01:00. Contact: ###-####. 6 inch line installed from street to east stair (will be completed later after coring the wall at stair to feed pump); PIV located at street and thrust blocks installed 11/7/2000 4:07:28 PM
BLD00-00740 FIRE-Final Inspection11/7/200011/7/200011/7/2000 12:00:00 AMPNR
Ernie ###-#### rescheduled for 11/9 11/7/2000 4:05:48 PM