Inspections for the day of: Tuesday, November 7, 2000.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorSteven Webb
Title 
Phone #794-9491
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-02644 BLD-Footing11/6/200011/7/200011/7/2000 12:00:00 AMAPASS
###-#### randy wilson if you have any problems call him. key at ac unit this is a separate area from the house, go through side gate no dogs
BLD00-02306 BLD-Framing/Rough-in11/6/200011/7/200011/7/2000 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 11/06/2000 at 14:33:37. Contact: . issued c/n, needs shear nailing and strap on framing at top plates--back wall. 11/7/2000 11:22:12 AM
BLD00-01180 BLD-Conference11/6/200011/7/200011/7/2000 12:00:00 AMAPASS
###-#### Matt
BLD00-01583 BLD-Framing/Rough-in11/6/200011/7/200011/7/2000 12:00:00 AMAPASS
###-####
BLD00-01583 BLD-Energy code compliance11/6/200011/7/200011/7/2000 12:00:00 AMAPASS
need energy report prior to issuance of C. of O. 11/7/2000 8:58:05 AM
BLD00-01582 BLD-Framing/Rough-in11/6/200011/7/200011/7/2000 12:00:00 AMAPASS
ok to cover 11/7/2000 8:44:36 AM
BLD00-01582 BLD-Energy code compliance11/6/200011/7/200011/7/2000 12:00:00 AMAPASS
c/n posted; need energy report prior to issuance of C. of O. 11/7/2000 8:44:24 AM
BLD99-03660 BLD-Final11/6/200011/7/200011/7/2000 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 11/06/2000 at 15:55:19. Contact: ###-####.
BLD00-02977 BLD-Framing/Rough-in11/7/200011/7/200011/7/2000 12:00:00 AMPFAIL
nailing\\###-####: c/n spacing to far apart. 11/7/2000 4:18:08 PM
BLD00-03188 BLD-Footing11/7/200011/7/200011/7/2000 12:00:00 AMPPASS
FT INSP ###-####- TONY : already poured, looks ok 11/7/2000 3:58:42 PM
BLD00-00901 BLD-Final11/7/200011/7/200011/7/2000 12:00:00 AMPFAIL
Bill ###-#### please call before going out so that he can meet you out there for access: c/n issued, need sign offs, plans on site, smoke d. exit landing etc. 11/7/2000 3:39:20 PM
BLD00-02341 BLD-Framing/Rough-in11/6/200011/7/200011/7/2000 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 11/06/2000 at 09:25:08. Contact: ###-####. c/n isued need to complete shear nailing, framing items and holddown locations verification. ok to insulate. 11/7/2000 2:41:21 PM