Inspections for the day of: Wednesday, November 7, 2001.
Number of inspections: 18
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS01-00172 MIS-Aging Inspection11/7/200111/7/200111/9/2001 12:00:00 AM NR
unable to contact 11/9/2001 5:08:53 PM
BLD01-00252 BLD-Aging Inspection11/7/200111/7/200111/7/2001 12:00:00 AM NR
wip, keep c/n 11/7/2001 4:29:21 PM
BLD00-03449 BLD-Aging Inspection11/7/200111/7/200111/7/2001 12:00:00 AM NR
demo bsmt/mech for west wing emodel. 11/7/2001 10:05:25 AM
BLD01-01892 BLD-Aging Inspection11/7/200111/7/200111/7/2001 12:00:00 AM NR
wip, sfd remodel 11/8/2001 9:26:39 AM
BLD01-02607 BLD-Framing/Rough-in11/7/200111/7/200111/7/2001 12:00:00 AMAPART
Added by Inspector: 340 On 11/7/2001 11:36:40 AM joisting for hvac penthouse floor only...need plan notes &/or spec insp for epoxy bolt connections to existing masonry & steel members supprting hvac equipment. Also, need clarify if machinery room req's apply.
BLD00-03729 BLD-Framing/Rough-in11/7/200111/7/200111/7/2001 12:00:00 AMAPART
Added by Inspector: 340 On 11/7/2001 11:40:01 AM upper portions wall at B08 cooridor, alcoved areas ok. Per previous conf. ok to delete tunnel and run walls to "rated" deck this area. Need verify rating req's of indivually protected col's/beams
BLD99-03148 BLD-Conference11/6/200111/7/200111/7/2001 12:00:00 AMAPASS
###-#### onsite w/ Brett, Ken H. & Id. State insp Gary Barnes re conflict between lift (elevator) & ADA, per elev regs, door must be w/i 3" of lift, but will not meet ADA door clearance req's !cc/ANSI t-404.2.1... will advise 11/7/2001 2:26:38 PM 11/7/2001 2:30:50 PM
BLD00-03729 BLD-Foundation11/6/200111/7/200111/7/2001 12:00:00 AMAPART
BRUCE ###-#### S.E. corner walls ok 11/7/2001 11:37:18 AM
BLD00-01649 BLD-Framing/Rough-in11/6/200111/7/200111/7/2001 12:00:00 AMAPART
Scheduled by Inspector: 340 On 11/6/2001 4:50:02 PM 10-12:00 please. 2hr. horiz. exit wall & bsmt separation walls, keep c/n, need archs detail for 4th fl 2hr wall; %th fl courts & perim room grids ok 11/7/2001 2:32:26 PM
BLD01-01908 BLD-Final11/6/200111/7/200111/7/2001 12:00:00 AMANR
Scheduled by a contractor via Hello! on 11/06/2001 at 18:26:49. Contact: ###-####...need fire & p&z 11/7/2001 11:28:44 AM
BLD01-02607 BLD-Conference11/6/200111/7/200111/7/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 11/06/2001 at 18:33:51. Contact: ###-####...w/ contractor at site, need structural notes to verify if special insp req'd for steel column attachment to walls& as need. 11/7/2001 11:33:28 AM
BLD01-01889 BLD-Energy code compliance11/7/200111/7/200111/7/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 11/07/2001 at 06:58:39. Contact: ###-####. walls, floor ok 11/7/2001 3:38:44 PM
BLD01-02441 BLD-Framing/Rough-in11/7/200111/7/200111/7/2001 12:00:00 AMPPASS
###-#### JAY, c/n ok. 11/7/2001 5:17:36 PM
BLD01-00379 BLD-Framing/Rough-in11/7/200111/7/200111/7/2001 12:00:00 AMPNR
###-#### chris exterior sheer wall , nr recall. 11/7/2001 5:03:06 PM
BLD01-02088 BLD-Framing/Rough-in11/7/200111/7/200111/7/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 11/07/2001 at 09:59:55. Contact: ###-####. keep c/n, ok to insulate only;med press. gas piping still failed. 11/7/2001 4:43:00 PM
BLD00-01649 BLD-Framing/Rough-in11/7/200111/7/200111/7/2001 12:00:00 AMPPART
Scheduled by Inspector: 340 On 11/7/2001 2:33:35 PM bsmt corridor & separation walls part, 2hr sep. wall infill is ok to use shaftwall system; need verify proper glazing at 2hr wall doors (visitation rooms, etc.) 11/7/2001 4:31:37 PM
BLD01-00252 BLD-Conference11/7/200111/7/200111/7/2001 12:00:00 AMPPASS
Added by Inspector: 340 On 11/7/2001 4:36:31 PM w/ Icon re c/n...bring landings to level w/ floor
BLD01-02625 BLD-Final11/6/200111/7/200111/7/2001 12:00:00 AMPFAIL
###-#### LARRY; complete fire c/n, ok for t/o. 11/7/2001 5:11:24 PM