Inspections for the day of: Thursday, November 7, 2002.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-00692 BLD-Framing/Rough-in11/6/200211/7/200211/7/2002 12:00:00 AMAFAIL
###-#### C/N No approved plans.... Remove Ext wall covering for shear insp....stop working on Ext. 11/7/2002 11:32:33 AM
BLD02-02453 BLD-Framing/Rough-in11/6/200211/7/200211/7/2002 12:00:00 AMAPART
call first; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung Gave OK to cover areas un-affected by Minor changes ie...small wall, door swing changes.....Need resubmittal from Arch for appr of changes. 11/7/2002 10:17:27 AM
MEC02-03146 Final11/6/200211/7/200211/7/2002 12:00:00 AMAPASS
garage code 1234 enter inspect pellet sove in basement
BLD02-01897 BLD-Final11/6/200211/7/200211/7/2002 12:00:00 AMAFAIL
Need all trade finals B 4 calling for structural. (red sticker...window) 11/7/2002 9:24:20 AM
BLD02-02654 BLD-Foundation11/5/200211/7/200211/7/2002 12:00:00 AMAPASS
JOHN; Phone #: ###-#### Internet Inspection Request from: Darla Downs Ran out of mud on footing....Poured remainder today... previously passed by 408. 11/7/2002 9:36:05 AM
MIS02-00283 BLD-Conference11/5/200211/7/200211/7/2002 12:00:00 AMAPART
Per compliant--Chuck Black--###-####. compliant--Chuck Black--###-####. 11/7/2002 8:59:25 AM Chuck Black (contr.) Worked on access road to flag lot....Plans at City pending approval. Talked to owner of house at 2503, Not the complaining party. Contractor said he will not proceed with work until he has approved plans (Verbal). 11/7/2002 9:05:55 AM
BLD00-02716 BLD-Final11/5/200211/7/200211/7/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 11/05/2002 at 16:55:49. Contact: ###-####. C/N...Gar/house separation, handrails, non complying stairs to Bsmnt. 11/7/2002 1:10:06 PM
BLD02-00311 BLD-Framing/Rough-in11/6/200211/7/200211/7/2002 12:00:00 AMPPART
###-#### jim 2nd floor frame...less restrooms...OK Need Plumb R/I approval on restrooms. OK to lid at elevator room. Need appr on deletion of walls at copy machines (center 2nd flr) and wing wall at SW stairway. 11/7/2002 3:33:28 PM 11/7/2002 3:36:01 PM
BLD02-02439 BLD-Final11/6/200211/7/200211/7/2002 12:00:00 AMPPASS
signs for On The Border; Phone #: ###-#### Internet Inspection Request from: Susie Seltzer
BLD02-02532 BLD-Final11/6/200211/7/200211/7/2002 12:00:00 AMPFAIL
sign for Benchmark Family Dentistry; Phone #: ###-#### Internet Inspection Request from: Susie Seltzer Called....Need Ele final. 11/7/2002 1:59:56 PM
BLD02-02046 BLD-Energy code compliance11/7/200211/7/200211/7/2002 12:00:00 AMPPASS
###-#### BILL
MEC02-02655 Final11/7/200211/7/200211/7/2002 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 11/07/2002 at 10:41:54. Contact: ###-####. key is elec outlet by front door C/N on site. 11/7/2002 2:27:24 PM
BLD02-01985 BLD-Final11/7/200211/7/200211/7/2002 12:00:00 AMPFAIL
###-#### bret No plans or Occ request card on site. 11/7/2002 1:58:08 PM
BLD02-01396 BLD-Final11/7/200211/7/200211/7/2002 12:00:00 AMPPASS
WAYNE; Phone #: ###-#### Internet Inspection Request from: Darla Downs C/C issued. 11/7/2002 12:13:33 PM