Inspections for the day of: Thursday, November 7, 2002.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-01581 BLD-Framing/Rough-in11/6/200211/7/200211/7/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 11/06/2002 at 00:00:47. Contact: ###-####.posted c/n needs truss details and s-i on welding. 11/7/2002 12:48:59 PM
BLD02-02003 BLD-Framing/Rough-in11/6/200211/7/200211/7/2002 12:00:00 AMANR
###-#### I called con 11/7/2002 11:33:18 AM tractor and told him he still needs mec inspection but also the bath fan is not vented in attic.11/7/2002 11:33:50 AM 11/7/2002 11:34:17 AM
BLD02-02377 BLD-Energy code compliance11/6/200211/7/200211/7/2002 12:00:00 AMAPASS
ernie; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD02-01461 BLD-Framing/Rough-in11/6/200211/7/200211/7/2002 12:00:00 AMAPART
dave; Phone #: ###-#### Internet Inspection Request from: Marsha Smylieneeds ancho 11/7/2002 12:30:06 PM exterior walls only needs anchor bolts at plate breaks. notified contractor on site,to check with engineer. 11/7/2002 12:41:35 PM
MIS02-00254 BLD-Final11/6/200211/7/200211/7/2002 12:00:00 AMAFAIL
###-####c/n posted. 11/7/2002 11:12:52 AM
BLD02-02371 BLD-Final11/6/200211/7/200211/7/2002 12:00:00 AMAPART
###-#### mike. 11/6/2002 5:03:31 PM. Ok for a temp oc pending plumbing final approval. 11/7/2002 9:57:44 AM
BLD02-02299 BLD-Energy code compliance11/7/200211/7/200211/7/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 11/07/2002 at 07:45:40. Contact: ###-####.
MEC02-03185 Final11/7/200211/7/200211/7/2002 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 11/07/2002 at 08:16:08. Contact: ###-####.90 deg elbow needed at termination and combustion air intake kit not installed on unit. 11/7/2002 3:13:49 PMposted c/n in house with owner. 11/7/2002 3:14:04 PM
MEC02-00197 Conference11/7/200211/7/200211/7/2002 12:00:00 AMPCANC
###-#### becky extentsion only allready done see notes under am inspection. 11/7/2002 12:52:15 PM 11/7/2002 12:52:23 PM
MEC02-01639 Final11/7/200211/7/200211/7/2002 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 11/07/2002 at 09:28:48. Contact: ###-####.
entry code 1234same c/n install protection post. 11/7/2002 2:26:48 PM
BLD02-01839 BLD-Foundation11/7/200211/7/200211/7/2002 12:00:00 AMPPART
Phone #: ###-#### Internet Inspection Request from: Rita DeYoungwip. 11/7/2002 2:03:37 PM
MIS02-00291 BLD-Conference11/6/200211/7/200211/7/2002 12:00:00 AMPPART
THIS INSPECTION IS TO DETERMIN WHAT KINDS OF PERMITS WILL BE NEEDED ( FIRE DAMAGE ?) LARRY ###-#### OR ###-#### Needs some trusses replaced and electrical repaired, extent of damage is in livingroom and garage.11/7/2002 1:26:07 PM 11/7/2002 1:29:59 PM