BLD02-02254
| BLD-Framing/Rough-in | 11/6/2002 | 11/7/2002 | 11/7/2002 12:00:00 AM | A | PASS |
|
|
harry ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok to insulate 11/7/2002 10:52:19 AM
|
BLD02-01177
| BLD-Energy code compliance | 11/6/2002 | 11/7/2002 | 11/7/2002 12:00:00 AM | A | NR |
|
|
SHANE; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD02-00090
| BLD-Conference | 11/6/2002 | 11/7/2002 | 11/7/2002 12:00:00 AM | A | DONE |
|
|
trying to get a meeting set up 11/7/2002 3:45:18 PM
|
BLD02-02543
| BLD-Framing/Rough-in | 11/6/2002 | 11/7/2002 | 11/7/2002 12:00:00 AM | A | PART |
|
|
Please call when you get to the site so I can tell you where the plans are located. Thank you.; Phone #: ###-#### Internet Inspection Request from: Jeff Ware sub frame decking stair treads risers handrail and gaurd not installed at this time 11/7/2002 11:23:15 AM
|
BLD02-02298
| BLD-Framing/Rough-in | 11/6/2002 | 11/7/2002 | 11/7/2002 12:00:00 AM | A | PASS |
|
|
insulation also ok ok to cover 11/7/2002 10:21:09 AM
|
MEC02-03191
| Rough-in | 11/6/2002 | 11/7/2002 | 11/7/2002 12:00:00 AM | A | PASS |
|
|
|
MEC02-03134
| Rough-in | 11/6/2002 | 11/7/2002 | 11/7/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 11/06/2002 at 17:45:07. Contact: ###-####.
|
MEC02-03134
| Pressure Test | 11/7/2002 | 11/7/2002 | 11/7/2002 12:00:00 AM | A | PASS |
|
|
|
BLD02-02256
| BLD-Framing/Rough-in | 11/7/2002 | 11/7/2002 | 11/7/2002 12:00:00 AM | P | PART |
|
|
sheer ###-#### chris plans on top of fire place shear ok to cover ext 11/7/2002 3:32:12 PM
|
BLD02-02495
| BLD-Footing | 11/7/2002 | 11/7/2002 | 11/7/2002 12:00:00 AM | P | PART |
|
|
###-#### jerad work in progress crew is checing with arc on rebar plans call for two in ftg and two in wall crew wants to use rebar only in walls with hold downs 11/7/2002 1:32:45 PM
|
BLD02-01474
| BLD-Framing/Rough-in | 11/7/2002 | 11/7/2002 | 11/7/2002 12:00:00 AM | P | FAIL |
|
|
need a letter from engineer aproving all steel beams and columns also the rest of the beams and their connections sevral changes have been made durning constrution also needs fire place c/n items completed and fire stopping top and bottom of chase by stairs
|
MEC02-00563
| Final | 11/6/2002 | 11/7/2002 | 11/7/2002 12:00:00 AM | P | PASS |
|
|
NEEDS FINAL\\###-#### TERRY
|
BLD02-01474
| BLD-Energy code compliance | 11/7/2002 | 11/7/2002 | 11/7/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 11/07/2002 at 07:58:24. Contact: ###-####.
|
BLD02-02159
| BLD-Framing/Rough-in | 11/7/2002 | 11/7/2002 | 11/7/2002 12:00:00 AM | P | FAIL |
|
|
###-#### c/n on site 11/7/2002 3:19:35 PM
|
BLD02-02318
| BLD-Energy code compliance | 11/7/2002 | 11/7/2002 | 11/7/2002 12:00:00 AM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
|
MEC02-03087
| Rough-in | 11/7/2002 | 11/7/2002 | 11/7/2002 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 11/07/2002 at 08:57:37. Contact: ###-####.crew still working on mec rough in 11/7/2002 3:32:56 PM
|
MEC02-03087
| Pressure Test | 11/7/2002 | 11/7/2002 | 11/7/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 11/07/2002 at 08:58:04. Contact: ###-####.
|