BLD02-02095
| FIRE-Final Inspection | 11/6/2002 | 11/7/2002 | 11/7/2002 12:00:00 AM | A | FAIL |
|
|
Fire sprinkler work without a permit.
Provide city approved fire sprinkler drawings, contractor stated that the existing sprinkler heads are spaced 18 x 18 but he is spacing the pendant in the sunroom 20 x 20 fed from 3/4" pipe. A sidewall sprinkler head will need to be added in the garage along the new wall 11/7/2002 10:53:01 AM
|
BLD02-00751
| FIRE-Conference | 11/6/2002 | 11/7/2002 | 11/7/2002 12:00:00 AM | A | DONE |
|
|
spoke with the contractor about curb painting, fire extinguisher placement and door hardware. 11/7/2002 9:42:00 AM
|
FIR02-00144
| INSP-Final Inspection | 11/6/2002 | 11/7/2002 | 11/7/2002 12:00:00 AM | A | FAIL |
|
|
provide revised battery calcs for the 24ah batteries, provide labels and zone map 11/7/2002 9:43:28 AM
|
BLD02-01985
| FIRE-Final Inspection | 11/6/2002 | 11/7/2002 | 11/7/2002 12:00:00 AM | A | PASS |
|
|
###-#### brett
|
BLD02-01985
| FIRE-Final Inspection | 11/6/2002 | 11/7/2002 | 11/7/2002 12:00:00 AM | A | PASS |
|
|
###-#### brett
|
BLD02-02200
| FIRE-Final Inspection | 11/7/2002 | 11/7/2002 | 11/7/2002 12:00:00 AM | P | FAIL |
|
|
provide one 2-A10BC fire extinguisher with current inspection tag mounted with handle at 48" in a normal path of travel. See note #3, repair exit signs in path of eress from tenant space to building exterior then test exit signs. Provide City of Boise approved fire alarm plans. See note #2. Replace the insulation above the sprinkler uprights along the north half of the new demising wall. Provide ceiling tile at the sprinkler pendants and replace the missing canopies. Remove the dry wall splatter from the sprinkler pendants. Provide a suite address for tenant and provide a key for the "knox box" 11/7/2002 1:53:58 PM
|
FIR02-00403
| INSP-Final Inspection | 11/7/2002 | 11/7/2002 | 11/7/2002 12:00:00 AM | P | FAIL |
|
|
insulation needs to be installed above the sprinkler uprights along the new demising wall and provide tiles and canopies at sprinkler pendants prior to finaling
|
FIR02-00403
| INSP-Final Inspection | 11/7/2002 | 11/7/2002 | 11/7/2002 12:00:00 AM | P | FAIL |
|
|
insulation needs to be installed above the sprinkler uprights along the new demising wall and provide tiles and canopies at sprinkler pendants prior to finaling
|