FIR03-00347
| INSP-Sprinkler Rough-in/Hydro | 11/6/2003 | 11/7/2003 | 11/7/2003 12:00:00 AM | A | PART |
|
|
11 am - air test end - 49 psi air test okay; need head in closet by entryway; tenting in progress for return bend and will be completed before insulating 11/7/2003 1:59:04 PM
|
BLD03-00887
| FIRE-Final Inspection | 11/6/2003 | 11/7/2003 | 11/7/2003 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 11/6/2003 at 6:09:43 PM. Contact: ###-####.
|
FIR03-00458
| INSP-Alarm Testing | 11/7/2003 | 11/7/2003 | 11/7/2003 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 11/7/2003 at 6:56:30 AM. Contact: ###-####. new horn/strobe was changed to circuit #41 11/7/2003 8:29:26 AM
|
BLD03-00959
| FIRE-Final Inspection | 11/7/2003 | 11/7/2003 | 11/7/2003 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 11/7/2003 at 8:41:32 AM. fire not required for sign-off; sent the BLD final to #425 11/7/2003 10:11:37 AM
|
MIS03-00219
| FIR-Final | 11/3/2003 | 11/7/2003 | 11/7/2003 12:00:00 AM | P | FAIL |
|
|
###-#### mike the plans don't match actual walls; this building is partially sprinklered and only in two of the spaces; need tags on extinguishers 11/7/2003 2:00:47 PM
|
FIR03-00421
| INSP-Final Inspection | 11/4/2003 | 11/7/2003 | 11/7/2003 12:00:00 AM | P | PASS |
|
|
Billy---would like around 2:30; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|