ELE05-02402
| Final | 11/7/2005 | 11/7/2005 | 11/7/2005 5:22:53 PM | P | FAIL |
|
|
justin; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles called contr, left corr notice, 210.52(C)(1) recpt shall be added by range, 210.52(A)(2) garage recpts shall be gfci, 422.31(B) dishwasher shall have lockout provided at breaker, 408.4 circuit 9 shall be explicit, 406.5 recpt faceplates shall seat against mounting surface,110.13(A) front recpt cover shall be secure and operate
|
ELE05-04010
| Electrical Rough-In | 11/7/2005 | 11/7/2005 | 11/7/2005 5:18:30 PM | P | FAIL |
|
|
kelly; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles no panel set, talked to elect, left corr notice, 210.52(A)(2) recpt shall be added in entry area wall, 210.52(F) recpt shall be added at rear of dwelling, 314.20 boxes shall be flush with combustible material, 334.30 nm cable shall be supported within 12" of boxs, 300.4(A)(1) edge of bored hole shall be 1 1/4" from edgfe of framing member, 800.133(A)(1) comm cable shall not be run with power cables
|
ELE05-03000
| Final | 11/7/2005 | 11/7/2005 | 11/7/2005 5:13:45 PM | P | PASS |
|
|
###-#### - don ok to final
|
ELE05-03000
| Permanent Service | 11/7/2005 | 11/7/2005 | 11/7/2005 4:27:55 PM | P | PASS |
|
|
###-#### - don p/s done, job done, ok to final
|
ELE05-03938
| Final | 11/2/2005 | 11/7/2005 | 11/7/2005 4:24:26 PM | P | PASS |
|
|
WIRING FOR HOTTUB ON SECOND DECK. PLEASE CALL CUSTOMER STEVE COPE @ ###-#### TO SCHEDULE; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH ok to final
|
ELE05-02615
| Electrical Rough-In | 11/7/2005 | 11/7/2005 | 11/7/2005 2:07:19 PM | P | CANC |
|
|
Phone #: ###-#### Internet Inspection Request from: JENNY EMEL see p/s
|
ELE05-04025
| Permanent Service | 11/7/2005 | 11/7/2005 | 11/7/2005 12:31:42 PM | P | PASS |
|
|
###-#### - don called contr to plug hole, chg gec. ok to cover u/g to recpt. p/s u/g n ok
|
ELE03-03643
| Electrical Rough-In | 11/4/2005 | 11/7/2005 | 11/7/2005 10:19:46 AM | A | CANC |
|
|
request first thing in am//scott; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa cust called to postpone
|
ELE05-03147
| Final | 11/5/2005 | 11/7/2005 | 11/7/2005 9:02:29 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 11/5/2005 at 6:21:12 PM. Contact: ###-####. ok to final
|
ELE05-03278
| Electrical Rough-In | 11/4/2005 | 11/7/2005 | 11/7/2005 8:39:17 AM | A | CANC |
|
|
see rip
|
ELE05-00855
| Electrical Rough-In | 11/4/2005 | 11/7/2005 | 11/7/2005 8:18:23 AM | A | PASS |
|
|
CONTACT: LYLE DEAN 1ST FLOOR INSPECTION; Phone #: ###-#### Internet Inspection Request from: Deb McCoy ok to cover poured in u/g by elect room
|
ELE03-03037
| Final | 11/7/2005 | 11/7/2005 | 11/7/2005 7:41:17 AM | A | PASS |
|
|
final evaluation done 11-02-05, field report to be sent. witnessed final tagging of equipment. ok to final Bob R.
|
ELE05-03472
| Final | 11/7/2005 | 11/7/2005 | 11/7/2005 12:00:00 AM | A | PART |
|
|
part final ok, no cards on site, open item is curb by 480V panel.
|
ELE05-02615
| Permanent Service | 11/7/2005 | 11/7/2005 | 11/7/2005 12:00:00 AM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: JENNY EMEL p/s u/g n ok
|
ELE05-03278
| Rough-In Permanent Service | 11/7/2005 | 11/7/2005 | 11/7/2005 12:00:00 AM | P | PASS |
|
|
ri walls only ok, p/s u/g n ok
|