FIR06-00584
| INSP-Final Inspection | 11/6/2007 | 11/7/2007 | 11/8/2007 2:30:32 PM | A | PART |
|
|
Final pending ceiling tile and escutcheons, noted items from the previous inspection are complete.
|
FIR07-00749
| INSP-Alarm Testing | 11/5/2007 | 11/7/2007 | 11/8/2007 2:25:51 PM | A | PART |
|
|
Fire alarm work passed field inspection, final pending approved manual pull station locations within the remodeled area.
|
FIR07-00531
| INSP-Final Inspection | 11/5/2007 | 11/7/2007 | 11/7/2007 4:32:18 PM | P | PASS |
|
|
OH hydrostatic testing completed satisfactory, installation is acceptable, noted flexible couplings need to be added at the relocated hose station supply pipes per NFPA 13-see review comments, agreed to verify completion at the life safety final. Fire sprinkler permit finaled.
|
FIR07-00222
| INSP-Final Inspection | 11/6/2007 | 11/7/2007 | 11/7/2007 4:28:08 PM | A | FAIL |
|
|
Field installation does not match approved plan documents.
|
FIR07-00768
| INSP-Sprinkler Rough-in/Hydro | 11/7/2007 | 11/7/2007 | 11/7/2007 4:23:21 PM | P | PART |
|
|
Conference to discuss fire sprinkler head locations as field installed.
|
FIR07-00420
| INSP-Final Inspection | 11/7/2007 | 11/7/2007 | 11/7/2007 1:47:10 PM | P | PASS |
|
|
Fire sprinkler permit finaled.
|
FIR07-00420
| INSP-Sprinkler Rough-in/Hydro | 11/6/2007 | 11/7/2007 | 11/7/2007 1:46:18 PM | P | PART |
|
|
Hydrostatic testing of the preaction system piping completed per K. Roule.
|
BLD07-00986
| FIRE-Final Inspection | 11/5/2007 | 11/7/2007 | 11/7/2007 1:42:09 PM | A | PASS |
|
|
Access gates approved per FD, door hardware at the main entry/exit installed while on site, life safety inspection completed acceptable per site visit by K. Roule.
|
FIR07-00106
| INSP-Sprinkler Rough-in/Hydro | 11/6/2007 | 11/7/2007 | 11/7/2007 1:39:54 PM | A | PART |
|
|
UG fire supply line hydrostatic test passed.
|
FIR07-00502
| INSP-Sprinkler Rough-in/Hydro | 11/6/2007 | 11/7/2007 | 11/7/2007 1:39:08 PM | A | PART |
|
|
OH hydrostatic test passed, c/n items from the previous inspection have been completed, noted that no provision has been made at the riser for forward flow testing of the DCVA backflow.
|
FIR07-00413
| FIR-Aging Inspection | 11/7/2007 | 11/7/2007 | 11/7/2007 10:53:25 AM | | DEFR |
|
|
Under construction.
|
FIR07-00412
| FIR-Aging Inspection | 11/7/2007 | 11/7/2007 | 11/7/2007 10:52:34 AM | | DEFR |
|
|
Under construction.
|
BLD07-02244
| FIRE-Final Inspection | 11/2/2007 | 11/7/2007 | 11/7/2007 10:50:15 AM | A | PART |
|
|
Fire life safety pending satisfactory fire alarm testing.
|
FIR06-00595
| INSP-Alarm Testing | 11/5/2007 | 11/7/2007 | 11/7/2007 10:48:36 AM | A | FAIL |
|
|
FA inspection for the 3rd floor NE quad failed due to strobe synchronization issues.
|
FIR07-00755
| INSP-Sprinkler Rough-in/Hydro | 11/7/2007 | 11/7/2007 | 11/7/2007 12:00:00 AM | P | CANC |
|
|
javier Phone #: ###-####
|