Inspections for the day of: Friday, November 7, 2008.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBob Reichert
TitleELE-INSPECTOR
Phone #794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE07-03552 ELE-Aging Inspection11/7/200811/7/200811/7/2008 4:10:01 PM DONE
called, left message to return call with status
ELE07-03578 ELE-Aging Inspection11/7/200811/7/200811/7/2008 4:04:39 PM DONE
see final, work done
ELE07-03578 Final11/7/200811/7/200811/7/2008 4:04:20 PMPPASS
done with job, ok to final
ELE07-03625 ELE-Aging Inspection11/7/200811/7/200811/7/2008 4:02:34 PM DONE
called contractor to call for inspection, they said they are done
ESC08-00512 General Inspection11/7/200811/7/200811/7/2008 4:01:19 PMPPASS
looked ok
ESC07-01470 General Inspection11/7/200811/7/200811/7/2008 4:00:34 PMPPASS
looked ok
ELE08-02837 Final11/6/200811/7/200811/7/2008 3:59:26 PMPPASS
ready for inspection
Phone #: ###-#### Internet Inspection Request from: gary batten ok to final, no esc this project
ELE08-02410 Electrical Rough-In11/7/200811/7/200811/7/2008 2:43:55 PMPPASS
Ceiling Phone #: ###-#### Internet Inspection Request from: Celinda Winters ok to cover ceilings bathrooms and offices only
ELE08-02358 Final11/6/200811/7/200811/7/2008 1:45:11 PMPPASS
Hi Pat,
There''s not much to look at but we are ready, if you remember we added some receps in a couple of walls in the small offices, added receps in the new wall in the breakroom, and added some receps and a new light in the conference room, I think this was the bulk of it. If you have any questions I left Blakes cell number on the request, I will be out of town today.
Thx. Wayne Phone #: ###-#### Internet Inspection Request from: Wayne Craig ok to final, signed structural card, no esc this project
ELE08-02120 Electrical Rough-In11/6/200811/7/200811/7/2008 12:41:07 PMPCANC
Ceiling inspection. Chris is the onsite contact, his no. is ###-####. Phone #: ###-#### Internet Inspection Request from: Shawna Gates contractor said was supposed to be cancelled
ELE08-02735 Final11/6/200811/7/200811/7/2008 10:24:31 AMAPASS
Homeowner will be there after 8:30. If you have any questions, please call Clay. Thank You. Phone #: ###-#### Internet Inspection Request from: Clay Morgan ok to final, no esc this project
ELE08-02979 Electrical Rough-In11/6/200811/7/200811/7/2008 9:51:10 AMAPASS
Please call prior to arrival to arrange access. Call Dan @###-#### or Joe @###-#### Phone #: ###-#### Internet Inspection Request from: Joe Thomas called contractor, ok to cover floor heat only, no esc this project
ELE08-02982 Electrical Rough-In11/7/200811/7/200811/7/2008 8:59:12 AMAPASS
please call 30 min prior homeowner away will provide access. ###-#### Phone #: ###-#### Internet Inspection Request from: joe wheeler ri ok, no esc this project
ELE08-02982 Final11/7/200811/7/200811/7/2008 8:55:52 AMAPASS
please call 30 min prior homeowner away will provide access. ###-#### Phone #: ###-#### Internet Inspection Request from: joe wheeler ok to final, no esc this project
ELE08-02981 Conference11/6/200811/7/200811/7/2008 8:29:21 AMADONE
teresa- Phone #: ###-#### reviewed dedicated circuit, 1 1/4", make-up, add eceptacle in new wall, when to call for ri, no esc this project
ELE08-02750 Final11/3/200811/7/200811/7/2008 8:00:18 AMAPASS
disconnects are marked ul listing should have been done on the 6th. am ready to final off thanx joe. Phone #: ###-#### Internet Inspection Request from: joe wheeler machines approved by field evaluation, ok to final, signed card, no esc this project