ESC07-00070
| Conference | 11/7/2008 | 11/7/2008 | 11/7/2008 4:46:08 PM | P | DONE |
|
|
this was a conferance over correction notice.
|
PLM08-01432
| Plumbing Rough-in | 11/7/2008 | 11/7/2008 | 11/7/2008 4:19:46 PM | P | PASS |
|
|
ok to cover except drinking fountains on 2nd & 3rd floor, approved plans show drinking fountains-cannot delete without approval.
|
PLM08-02593
| Final | 11/7/2008 | 11/7/2008 | 11/7/2008 3:49:01 PM | P | PART |
|
|
try for around 4pm. please call mile on way out at ###-####. thanks! Phone #: ###-#### Internet Inspection Request from: Kelea Dunne
|
PLM08-02282
| Other | 11/7/2008 | 11/7/2008 | 11/7/2008 3:47:36 PM | P | DONE |
|
|
this was a conferance on venting
|
PLM08-02587
| Water and/or Sewer | 11/7/2008 | 11/7/2008 | 11/7/2008 2:43:31 PM | P | PASS |
|
|
greg Phone #: ###-####
|
PLM08-02063
| Final | 11/7/2008 | 11/7/2008 | 11/7/2008 2:42:15 PM | P | CANC |
|
|
guy Phone #: ###-####
|
ESC08-00855
| General Inspection | 11/7/2008 | 11/7/2008 | 11/7/2008 1:41:34 PM | P | PART |
|
|
left verbal correction with rp that by the next pour he needs to install a concrete washout pit.
|
PLM08-02585
| Water and/or Sewer | 11/7/2008 | 11/7/2008 | 11/7/2008 1:40:08 PM | P | PASS |
|
|
|
ESC08-00539
| Tracking Control | 11/6/2008 | 11/7/2008 | 11/7/2008 11:34:48 AM | A | PASS |
|
|
tracking has been cleaned up.
|
PLM08-01432
| Plumbing Rough-in | 11/5/2008 | 11/7/2008 | 11/7/2008 11:34:12 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 11/5/2008 at 3:25:29 PM. Contact: ###-####. water pass, need to fix leaks on dwv.
|
PLM08-02581
| Plumbing Rough-in | 11/6/2008 | 11/7/2008 | 11/7/2008 11:28:03 AM | A | PASS |
|
|
Brian- ###-####
|
PLM08-02585
| Water and/or Sewer | 11/6/2008 | 11/7/2008 | 11/7/2008 9:19:59 AM | A | NR |
|
|
paul Phone #: ###-####
|
PLM08-02578
| Plumbing Rough-in | 11/6/2008 | 11/7/2008 | 11/6/2008 3:53:27 PM | A | CANC |
|
|
JOB # 15352 Phone #: ###-#### Internet Inspection Request from: Ann Marie Reyes Inspection cancelled from web by: Ann Marie Reyes
|