FIR12-00108
| INSP-Sprinkler Rough-in | 11/7/2012 | 11/7/2012 | 11/8/2012 4:05:33 PM | A | PART |
|
|
Okay to cover work at the 1st floor lobby as marked on approved plan set. Provide clips at trapeeze hangers per discussion.
|
BLD11-01695
| FIRE-Final Inspection | 11/7/2012 | 11/7/2012 | 11/8/2012 7:41:12 AM | P | PASS |
|
|
Shell permit fire life safety finaled.
|
FIR12-00287
| INSP-Final Inspection | 11/6/2012 | 11/7/2012 | 11/8/2012 7:38:33 AM | P | FAIL |
|
|
Missing seismic braces per plan at the new 3" main 1st floor. Remainder of ceiling tile and escutcheons yet to be installed at the second floor.
|
BLD12-01193
| FIRE-Final Inspection | 11/7/2012 | 11/7/2012 | 11/7/2012 12:54:44 PM | A | PASS |
|
|
Correction items verified. Hardware at cooler doors to be completed as discussed. Fire life safety finaled.
|