Inspections for the day of: Wednesday, November 7, 2012.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR09-00263 FIR-Aging Inspection11/7/201211/7/201211/8/2012 12:25:05 PM NR
Matt still needs to get this permit voided.
FIR12-00628 INSP-Sprinkler Rough-in/Hydro11/6/201211/7/201211/7/2012 3:46:13 PMPPART
The plan review comments could not be located on site but per online documentation it appears a hydro test is required. I spoke to Stephen about this. I also noted two painted upright sprinkler heads. Their locations are marked on the plans. Also two branchlines, with sprinkler heads, are located less than 6'-0" from one another . On of them does not appear on the approved plans. Plans showing the actual pipe routing will need to be resubmitted and the spacing issue corrected. This list is not all inclusive since not all of the walls/work has been completed at this time.
FIR12-00418 INSP-Sprinkler Rough-in11/7/201211/7/201211/7/2012 3:33:38 PMPPASS
The sprinkler piping on the first and second floors of this building can be covered. The third floor can not be covered due to piping and tenting issues. Potential problems exist on the first and second floors due to soffits. Contractor and I discussed the need for sprinkler spacing to meet NFPA 13R figure 6.4.6.3.4.3.
BLD12-02649 FIRE-Conference11/7/201211/7/201211/7/2012 2:15:35 PMPDONE
The tenant request information on the fire rating requirements of a glass window. I defered her to the building inspector for help.
BLD12-00551 FIRE-Conference11/7/201211/7/201211/7/2012 2:14:11 PMPDONE
The sprinkler piping in the main lobby area has been covered by sheet rock without approval. I spoke to the job site superintendant about a possible stop work order if covering pipe prior to an inspection continued. He agreed that it would not happen again. Access needs to be provided for the following inspection.
FIR12-00365 INSP-Sprinkler Rough-in11/7/201211/7/201211/7/2012 2:12:20 PMPFAIL
Joe Snyder was requesting a rough-in inspection for the main lobby entry area. I could not give approval due to the piping arrangement not matching the approved plans. The BB heads have been removed and standard coverage upright heads installed. Also the piping has been covered by sheet rock without approval. I spoke to the job site superintendant about a possible stop work order if covering pipe prior to an inspection continued. He agreed that it would not happen again. Plans need to be resubmitted showing the piping changes in all areas and access provided for the following inspection.