Inspections for the day of: Wednesday, November 7, 2012.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC12-00165 General Inspection11/7/201211/7/201211/8/2012 3:22:10 PM PART
ESC12-00288 General Inspection11/7/201211/7/201211/8/2012 7:43:33 AM FAIL
Verbal to RP:
Maintain concrete washout located in the north section of the project. Containerize all trash debris thourgh out the project area. Will follow up on 11/9/2012. Please refer to ESC12-00067 for the folloup inspection.
ESC12-00067 Aging Inspection11/7/201211/7/201211/8/2012 7:42:48 AM FAIL
Verbal to RP:
Maintain concrete washout located in the north section of the project. Containerize all trash debris thourgh out the project area. Will follow up on 11/9/2012
ESC12-00434 Aging Inspection11/7/201211/7/201211/8/2012 7:35:40 AM PASS
ESC12-00746 General Inspection11/7/201211/7/201211/7/2012 3:33:45 PM PASS
ESC11-00117 General Inspection11/7/201211/7/201211/7/2012 3:33:24 PM PASS
ESC12-00648 General Inspection11/7/201211/7/201211/7/2012 3:09:30 PM PASS
ESC12-00643 Conference11/7/201211/7/201211/7/2012 1:17:17 PMADONE
Discussed iwth the RP over project area. All areas of impact from the demolition work is stabilized. But will be look at drainage paytterns for the next month to see if additional measures are needed. Will follow up with a decision in one month.
ESC11-00874 BMP Violation11/6/201211/7/201211/7/2012 1:14:45 PMAFAIL
Verbal to RP:
Clean up all sediment and debris off of the hard surfaces. Place all trash debris into the provided containers. RP explained that he will be using exteral protection on the D.I.s within the active vertical construction area. Will follow up on 11/8/2012 PM
ESC11-00874 Conference11/7/201211/7/201211/7/2012 1:11:33 PMADONE
The RP will be submitting to the city a stabilization schedule on the subdivision. The map will show details of active and inactive areas of the project and what procedures will be implimented for stabilization. Must have the schedule map in by 11/21/2012.
Will follow up on 11/22/2012
ESC12-00177 Aging Inspection11/7/201211/7/201211/7/2012 8:18:15 AM PASS
ESC10-00778 General Inspection11/7/201211/7/201211/7/2012 7:44:59 AM PASS