FIR13-00290
| INSP-Supply line flush | 11/7/2013 | 11/7/2013 | 11/7/2013 3:35:11 PM | P | PASS |
|
|
Underground supply line flush passed
|
BLD13-00839
| FIRE-Conference | 11/7/2013 | 11/7/2013 | 11/7/2013 3:34:40 PM | P | DONE |
|
|
Follow up with Mark Brown on the hood suppresion system
|
BLD13-03110
| FIRE-Final Inspection | 11/7/2013 | 11/7/2013 | 11/7/2013 2:09:32 PM | P | CANC |
|
|
Wrong permit number called in. See permit number bld13-03028 for refernece to temp occupancy
|
BLD13-03028
| FIRE-Final Inspection | 11/7/2013 | 11/7/2013 | 11/7/2013 2:06:06 PM | P | PART |
|
|
A temporary occupancy is being given with scotts permission until the project related fire sprinkler permit has been addressed. All other life safety items are passed.
|
BLD13-02444
| FIRE-Final Inspection | 11/6/2013 | 11/7/2013 | 11/7/2013 2:02:34 PM | A | PASS |
|
|
life safety passed
|
BLD13-02685
| FIRE-Final Inspection | 11/6/2013 | 11/7/2013 | 11/7/2013 2:01:53 PM | A | PASS |
|
|
life safety passed
|
FIR13-00536
| INSP-Final Inspection | 11/6/2013 | 11/7/2013 | 11/7/2013 1:09:07 PM | A | PASS |
|
|
Permit finaled
|
BLD13-02026
| FIRE-Final Inspection | 11/6/2013 | 11/7/2013 | 11/7/2013 10:37:18 AM | A | PASS |
|
|
life safety passed
|