FIR14-00474
| INSP-Sprinkler Rough-in/Hydro | 11/6/2014 | 11/7/2014 | 11/7/2014 11:08:19 AM | A | PASS |
|
|
Overhead hydro test passed
|
FIR14-00055
| INSP-Alarm Testing | 11/6/2014 | 11/7/2014 | 11/7/2014 10:39:43 AM | A | CANC |
|
|
Before 11 - Dale Phone #: ###-####
|
FIR14-00700
| INSP-Final Inspection | 11/7/2014 | 11/7/2014 | 11/7/2014 10:35:51 AM | P | PASS |
|
|
permit finaled
|
BLD14-01496
| FIRE-Conference | 11/7/2014 | 11/7/2014 | 11/7/2014 10:31:00 AM | P | DONE |
|
|
Tom and I discussed fire dept access signage for the project.
|
BLD14-02162
| FIRE-Final Inspection | 11/6/2014 | 11/7/2014 | 11/7/2014 10:30:58 AM | A | FAIL |
|
|
Need city approved plans. I performed a conference with owner and went over fire extinguisher requirements and door hardware.
|
BLD14-02185
| FIRE-Final Inspection | 11/6/2014 | 11/7/2014 | 11/7/2014 9:25:52 AM | A | PASS |
|
|
life safety passed
|
FIR14-00704
| INSP-Conference | 11/5/2014 | 11/7/2014 | 11/7/2014 9:21:12 AM | P | DONE |
|
|
Brian and I discussed a/v layout and that as-builts are ok.
|