ESC14-00303
| General Inspection | 11/7/2014 | 11/7/2014 | 11/7/2014 4:04:57 PM | | CANC |
|
|
rescheduled
|
ESC14-00614
| General Inspection | 11/7/2014 | 11/7/2014 | 11/7/2014 4:04:05 PM | | CANC |
|
|
rescheduled
|
ESC14-00299
| General Inspection | 11/7/2014 | 11/7/2014 | 11/7/2014 4:03:25 PM | | CANC |
|
|
rescheduled.
|
ESC14-00310
| General Inspection | 11/7/2014 | 11/7/2014 | 11/7/2014 4:02:28 PM | | CANC |
|
|
rescheduled
|
ESC14-00326
| General Inspection | 11/7/2014 | 11/7/2014 | 11/7/2014 4:01:39 PM | | PASS |
|
|
|
ESC14-00296
| General Inspection | 11/7/2014 | 11/7/2014 | 11/7/2014 4:01:03 PM | | CANC |
|
|
rescheduled
|
ESC14-00342
| Aging Inspection | 11/7/2014 | 11/7/2014 | 11/7/2014 4:00:17 PM | | PASS |
|
|
Earthwork and exterior construction complete. No further ESC inspection required. Permit finaled.
|
ESC14-00342
| DOC - Permit Finaled | 11/7/2014 | 11/7/2014 | 11/7/2014 3:59:34 PM | P | PASS |
|
|
|
ESC14-01014
| Site Preparation | 11/7/2014 | 11/7/2014 | 11/7/2014 3:48:43 PM | P | PASS |
|
|
Keath ###-#### @ 3:30
Onsite meeting with RP/GC. Permit to be posted at driveway. There is an ongoing project in front of parcel. No MS4 on Warren, but will need monitor trackout during wet conditions and prevent/clean up as necessary. Lined pit to be used for washout.
Approved for construction.
|
ESC14-00343
| Aging Inspection | 11/7/2014 | 11/7/2014 | 11/7/2014 3:27:12 PM | | PASS |
|
|
WIP. Work and sediment confined to backyard. No ESC issues.
|
ESC14-00872
| Site Preparation | 11/7/2014 | 11/7/2014 | 11/7/2014 3:19:52 PM | P | PASS |
|
|
Gordon ###-####
Perimeter wattles installed. Permit posted. Glaztech is supervising the sub-contractors on the job. Low risk site. RP mistakenly filed eNOI but site disturbance is less than 1 acre and is not required.
Approved for warehouse addition construction.
|
ESC14-00608
| Random Inspection | 11/7/2014 | 11/7/2014 | 11/7/2014 2:41:01 PM | P | PART |
|
|
No effort to sweep up or prevent trackout on Old Hickory. Rest of site is graded so that stormwater is contained by Warm Spring Road embankment. No dewatering at time of inspection. Working an area greater than the listed disturbance. Will continue investigation.
No discharges and Warm Springs is clean and Boise permit posted
|
ESC13-00755
| Random Inspection | 11/7/2014 | 11/7/2014 | 11/7/2014 2:38:05 PM | P | PART |
|
|
Perimeter BMPs and inlet protection are installed and satisfactory. The interior road is paved but very dirty, with rain the site would discharge muddy stormwater. Site is said to sweep two times daily, but does not appear to be occuring. Unstabilized dirt at east entrance on Lysted is causing trackout and sediment accumulating in gutter.
Need to improve housekeeping and contain the sediment on Lysted street.
|
ESC13-00684
| General Inspection | 11/7/2014 | 11/7/2014 | 11/7/2014 2:23:17 PM | | PASS |
|
|
Antelope Springs is in good condition. Streets were being cleaned during the inspection, perfect timing. No water flowing through canal at this time, no erosion of sediments from lots, and stormdrains have protection. Site has a permanent contaiment barrier wall. No ESC corrections necessary.
|
ESC14-00341
| Aging Inspection | 11/7/2014 | 11/7/2014 | 11/7/2014 2:15:56 PM | | PASS |
|
|
Construction of garage complete and all building materials and loose dirt has been removed. ESC permit finaled.
|
ESC14-00341
| DOC - Permit Finaled | 11/7/2014 | 11/7/2014 | 11/7/2014 2:15:17 PM | P | PASS |
|
|
|
ESC14-00993
| Site Preparation | 11/7/2014 | 11/7/2014 | 11/7/2014 2:09:37 PM | P | PASS |
|
|
John Phone #: ###-####
Called RP and discussed project and BMPs. Stormdrain is 100 M down the street and very flat. Permit is posted and main BMP will be daily housekeeping as needed. Approved for construction.
|
ESC14-00630
| General Inspection | 11/7/2014 | 11/7/2014 | 11/7/2014 1:59:03 PM | | PASS |
|
|
Zoo Boise project contained within zoo compound, no issues reported or observed. WIP
|
ESC14-01048
| Site Preparation | 11/7/2014 | 11/7/2014 | 11/7/2014 11:51:45 AM | P | PASS |
|
|
Jason @ Syman ###-####
All homes to be demolished are surrounded by security fencing. The site is nearly flat, with sheet flow going north in direction of Boise River. Perimeter wattle has been trenched in at the north edge of site and DI on Broadway and Howe has filter protection. Permit posted on K2 sign. Requested that Jason inform K2 to have a water truck on site for dust suppresion during active demolishing.
Approved.
|
ESC14-00212
| BMP Violation | 11/7/2014 | 11/7/2014 | 11/7/2014 11:33:58 AM | P | PASS |
|
|
Yesterday I requested that RP Jose to re-engineer an improved settling and filtration system before continuing to dewater at Lusk Place. Dewatering was suspended and corrections were made. Jose called at 10:30 AM to inform they rebuilt the system and were getting turbidity measurements well within limits.
The new settling/receiving pond is completely lined with geotextile fabic and has a gravel dam within to increase settling time. After the dam, the water passes through a sediment curtain which was built with the geotextile lining. Before final discharge the water passes through 2 wattles to dissipate the flow. At the hose outlet, filter fabric was wrapped around to form a filter and slow the flow, the hose is layed up plastic piping cut in half to prevent stirriung up sediment under the geotextile fabric. The discharge was visibly clear at end of pond and final outlet and within limits.
Jose will file the corrective action reports in the SWPPP. Corrections complete, site currently in compliance.
|
ESC14-00743
| DOC - Permit Finaled | 11/7/2014 | 11/7/2014 | 11/7/2014 10:48:12 AM | P | PASS |
|
|
|
ESC14-00743
| Site Final | 11/7/2014 | 11/7/2014 | 11/7/2014 10:47:53 AM | A | PASS |
|
|
All exterior work complete, home is landscaped and surrounding area free of sediment from construction activities. ESC permit conditions satisfied.
|
ESC14-00685
| Site Final | 11/6/2014 | 11/7/2014 | 11/7/2014 10:35:02 AM | A | PASS |
|
|
Dan Appel Phone #: ###-#### >> Inspection requested via web by Daniel Appel
House is landscaped and undergoing final cleaning. BLD finaled. ESC conditions satisfied.
|
ESC14-00685
| DOC - Permit Finaled | 11/7/2014 | 11/7/2014 | 11/7/2014 10:34:20 AM | P | PASS |
|
|
|
ESC14-00290
| Aging Inspection | 11/7/2014 | 11/7/2014 | 11/7/2014 10:12:22 AM | | PASS |
|
|
Construction complete, yard is landscaped and stabilized. No ESC issues, permit finaled.
|
ESC14-00290
| DOC - Permit Finaled | 11/7/2014 | 11/7/2014 | 11/7/2014 10:12:08 AM | P | PASS |
|
|
|
ESC14-00282
| General Inspection | 11/7/2014 | 11/7/2014 | 11/7/2014 9:55:33 AM | | PASS |
|
|
Permit posted, lined concrete washout pit being utilized. No significant trackout or sediment runoff, streets and gutters are clean and all receiving drop inlets have filter bag protection. WIP, no corrections required.
|
ESC14-00324
| General Inspection | 11/6/2014 | 11/7/2014 | 11/7/2014 8:48:59 AM | P | PASS |
|
|
|
ESC14-00334
| Aging Inspection | 11/7/2014 | 11/7/2014 | 11/7/2014 8:40:36 AM | | PASS |
|
|
Pool construction and surrounding landscaping complete. ESC permit finaled.
|
ESC14-00334
| DOC - Permit Finaled | 11/7/2014 | 11/7/2014 | 11/7/2014 8:40:09 AM | P | PASS |
|
|
|
ESC14-00135
| BMP Violation | 11/4/2014 | 11/7/2014 | 11/6/2014 12:58:20 PM | A | PEND |
|
|
Check for corrections....
Compliance has been extended due to work that is to be completed on the hillside bank in front of house for new utility line installation. Full cleanup and stabilization will be completed after installation of utility line.
No new erosion, trackout, or other issues.
|