Inspections for the day of: Monday, November 7, 2016.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD16-00647 FIRE-Conference11/7/201611/7/201611/7/2016 3:24:39 PMPDONE
I pointed out the need for a fire sprinkler permit for the required work. Looks like all of the existing uprights have been painted and many additional heads are needed.
FIR16-00640 INSP-Sprinkler Rough-in/Hydro11/4/201611/7/201611/7/2016 3:02:19 PMAPASS
Overhead hydro test passed
BLD16-01388 FIRE-Final Inspection11/4/201611/7/201611/7/2016 1:55:45 PMPNR
Jake and I spoke about the need for emergency lights
BLD16-02622 FIRE-Final Inspection11/7/201611/7/201611/7/2016 1:43:58 PMPFAIL
provide additional address as per notes, provide a duct smoke detector and asssociated remote annunciator for hvac shutdown. and provide testing. Device is addressed in notes and shown on the E sheets.
FIR16-00494 INSP-Sprinkler Rough-in/Hydro11/7/201611/7/201611/7/2016 1:39:14 PMPPASS
Underground hydro test passed
BLD16-01725 FIRE-Final Inspection11/7/201611/7/201611/7/2016 12:00:47 PMPPASS
Life safety passed.
FIR16-00455 INSP-Sprinkler Rough-in/Hydro11/4/201611/7/201611/7/2016 11:19:17 AMAFAIL
Underground hydro test failed due to visible loss on guage.
BLD16-03405 FIRE-Final Inspection11/4/201611/7/201611/7/2016 8:42:46 AMAPASS
life safety passed
FIR07-00757 FIR-Aging Inspection11/7/201611/7/201611/7/2016 7:37:32 AM NR
Contractor is out of business