ESC16-01187
| General Inspection | 11/7/2017 | 11/7/2017 | 11/9/2017 10:42:08 AM | | PASS |
|
|
Frame complete, rooftop gutters and drainage installed. Landscaping to be completed next week. Trash contained, no trackout or discharge. RP George onsite. Approved.
|
ESC16-01391
| Aging Inspection | 11/7/2017 | 11/7/2017 | 11/9/2017 8:50:12 AM | | PASS |
|
|
Work complete. No ESC issues, BLD finaled.
|
ESC17-00842
| Tracking Control | 11/6/2017 | 11/7/2017 | 11/8/2017 2:49:50 PM | A | PART |
|
|
Street sweeping has been conducted at end of day during the hauling operation. All roadmix material appears to be in place.
Correction request: - crews need to work down Lancaster and clean up all silt/sediment left in gutters , Clean up loose material in the existing gutters at entrance.
|
ESC17-01134
| Site Preparation | 11/7/2017 | 11/7/2017 | 11/8/2017 2:46:34 PM | A | PASS |
|
|
SWO lifted, corrections complete. Uncontained concrete washout and wallboard has been cleaned up. Re-inspection fee paid.
Site is back in compliance.
|
ESC16-01332
| General Inspection | 11/7/2017 | 11/7/2017 | 11/8/2017 2:45:24 PM | | PASS |
|
|
North Hill townhome complete. Main site permit and active townhomes permitted seperately. BMPs to remain installed. No corrections.
|
ESC16-00741
| BMP Violation | 11/7/2017 | 11/7/2017 | 11/8/2017 10:32:18 AM | P | PART |
|
|
did not remove full concrete washout
RP stated subcontractor that empties and manages the concrete waste was out last week at time of initial request.
Corrections: - empty full concrete washout @ 5th& Idaho Street by end of day - clean mud & debris in curb & gutter area at the same corner mentioned above - replace inlet filter mat @ 5th & Main
RP stated that concrete washout is scheduled to be maintained today and will also replace filter mat before end of week.
|
ESC16-01188
| Aging Inspection | 11/7/2017 | 11/7/2017 | 11/8/2017 8:05:42 AM | | CANC |
|
|
|
ESC16-01354
| Tracking Control | 11/6/2017 | 11/7/2017 | 11/7/2017 10:35:32 AM | A | PASS |
|
|
follow up
New rock construction entrance installed and Myrtle and 11th were street swept. Next sweeping the bike lane and gutter should be a focus.
Corrections complete
|
ESC15-00306
| General Inspection | 11/7/2017 | 11/7/2017 | 11/7/2017 8:11:18 AM | | PEND |
|
|
new river repairs and project submittals are in development by Parks and Rec
|
ESC16-00990
| General Inspection | 11/7/2017 | 11/7/2017 | 11/7/2017 8:10:41 AM | | CANC |
|
|
|