Inspections for the day of: Wednesday, November 8, 1995.
Number of inspections: 32
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAlan Hauser
TitleMEC-COM/RES INSPECTOR
Phone #794-9453
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC95-01681 INSP - Gas log/ Fireplace11/8/199511/8/199511/8/1995 12:00:00 AM PASS
/ / 350 - GAS LOG/FIREPLACE ok
MEC95-01681 INSP - Gas pressure test11/8/199511/8/199511/8/1995 12:00:00 AM PASS
/ / 350 - GAS PIPING OK #27320
MEC95-01681 INSP - Gas pressure test11/8/199511/8/199511/8/1995 12:00:00 AM PASS
/ / 350 - GAS PIPING OK #27320
MEC95-01681 INSP - Gas log/ Fireplace11/8/199511/8/199511/8/1995 12:00:00 AM PASS
/ / 350 - GAS LOG/FIREPLACE ok
MEC95-01682 INSP - Gas pressure test11/8/199511/8/199511/8/1995 12:00:00 AM FAIL
/ / 350 - PRESSURE TEST failed
MEC95-01682 INSP - Gas log/ Fireplace11/8/199511/8/199511/8/1995 12:00:00 AM FAIL
/ / 350 - GAS LOG/FIREPLACE need to remove damper from fireplace
MEC95-01682 INSP - Gas pressure test11/8/199511/8/199511/8/1995 12:00:00 AM FAIL
/ / 350 - PRESSURE TEST failed
MEC95-01682 INSP - Gas log/ Fireplace11/8/199511/8/199511/8/1995 12:00:00 AM FAIL
/ / 350 - GAS LOG/FIREPLACE need to remove damper from fireplace
MEC95-01682 INSP - Gas pressure test11/8/199511/8/199511/8/1995 12:00:00 AM FAIL
/ / 350 - PRESSURE TEST failed
MEC95-01682 INSP - Gas pressure test11/8/199511/8/199511/8/1995 12:00:00 AM FAIL
/ / 350 - PRESSURE TEST failed
MEC95-01681 INSP - Retro Fit (check note)11/7/199511/8/199511/8/1995 12:00:00 AMANR
11/07/95 350 - GAS LOG GAS TEST
MEC95-01674 INSP - Framing/ Rough-in11/7/199511/8/199511/8/1995 12:00:00 AMAPASS
11/07/95 350 - ADDED DUCTWORK, COIL, AND AIR HANDLER IN 2 OFFICES BY THE ROUGH-IN IS OK FINAL AND SIGNED CARD
MEC95-01678 INSP - Framing/ Rough-in11/7/199511/8/199511/8/1995 12:00:00 AMAPART
11/07/95 350 - INSTALL HVAC SYSTEM ROUGH-IN IS OK BUT STILL NEED INTAKE AIR DUCT FOR COMPRESSOR ROOM EXHAUS AND TO FINISH GAS PIPING TO R.T.U.S
MEC95-01678 INSP - Final11/7/199511/8/199511/8/1995 12:00:00 AMACANC
11/07/95 350 - INSTALL HVAC SYSTEM 31,530.00
MEC95-01678 INSP - Final11/7/199511/8/199511/8/1995 12:00:00 AMACANC
11/07/95 350 - INSTALL HVAC SYSTEM 31,530.00
MEC95-01680 INSP - Final11/7/199511/8/199511/8/1995 12:00:00 AMAPASS
11/07/95 350 - STATEHOUSE INN FURNISH AND INSTALL HVAC FOR ELEVATOR WATE 10,725.00 ROUGH-IN IS OK TO MOVE TWO DRYER VENTS, THIS IS ALL THEY HAVE DONE AT TH POINT.
MEC95-01680 INSP - Final11/7/199511/8/199511/8/1995 12:00:00 AMAPASS
11/07/95 350 - STATEHOUSE INN FURNISH AND INSTALL HVAC FOR ELEVATOR WATE 10,725.00 ROUGH-IN IS OK TO MOVE TWO DRYER VENTS, THIS IS ALL THEY HAVE DONE AT TH POINT.
MEC3047432 INSP - Final11/7/199511/8/199511/8/1995 12:00:00 AMAFAIL
11/08/95 350 - AM PLEASE FURNACE CORR-CORREC-CALL FOR REINSP WHEN COMPLETED have upper combustion opening cut into bedroom, told them they would hav move it to the frontroom side of furnace room. gas tech told them to cu op
MEC3047432 INSP - Final11/7/199511/8/199511/8/1995 12:00:00 AMAFAIL
11/08/95 350 - AM PLEASE FURNACE CORR-CORREC-CALL FOR REINSP WHEN COMPLETED have upper combustion opening cut into bedroom, told them they would hav move it to the frontroom side of furnace room. gas tech told them to cu op
MEC95-01664 INSP - Gas log/ Fireplace11/7/199511/8/199511/8/1995 12:00:00 AMACANC
11/07/95 350 - CALL ###-#### FOR ACCESS, READY WED AM
MEC95-01671 INSP - Gas pressure test11/7/199511/8/199511/8/1995 12:00:00 AMAPASS
11/07/95 350 - GAS PIPING OK #27326
MEC95-01672 INSP - Rough-in & Gas Pressure11/7/199511/8/199511/8/1995 12:00:00 AMPPASS
11/08/95 350 - PRESSURE TEST not needed FURNACE OK
MEC3046814 INSP - Final11/8/199511/8/199511/8/1995 12:00:00 AMPPASS
11/08/95 350 - FINAL
MEC3046814 INSP - Final11/8/199511/8/199511/8/1995 12:00:00 AMPPASS
11/08/95 350 - FINAL
MEC95-00847 INSP - Final11/8/199511/8/199511/8/1995 12:00:00 AMPNR
11/08/95 350 - KEY UNDER ROCK OUT FRONT
MEC95-00847 INSP - Final11/8/199511/8/199511/8/1995 12:00:00 AMPNR
11/08/95 350 - KEY UNDER ROCK OUT FRONT
MEC95-01486 INSP - Retro Fit (check note)11/8/199511/8/199511/8/1995 12:00:00 AMPPASS
11/08/95 350 - FURNACE GAS PIPING OK #27318 FURNACE OK:30 TODAY
MEC95-01555 INSP - Gas log/ Fireplace11/7/199511/8/199511/8/1995 12:00:00 AMPPASS
11/08/95 350 - EARLY PM GAS LOG/FIREPLACE ok
MEC95-01555 INSP - Gas pressure test11/7/199511/8/199511/8/1995 12:00:00 AMPPASS
11/08/95 350 - GAS PIPING OK #27323
MEC95-01699 INSP - Gas pressure test11/8/199511/8/199511/8/1995 12:00:00 AMPPASS
11/08/95 350 - GAS PIPING OK #27324
MEC95-01704 INSP - Gas log/ Fireplace11/8/199511/8/199511/8/1995 12:00:00 AMPPASS
11/08/95 350 - CALL ###-#### FOR ACCESS GAS LOG/FIREPLACE
MEC95-01705 INSP - Framing/ Rough-in11/8/199511/8/199511/8/1995 12:00:00 AMPFAIL
11/08/95 350 - INSTALL NEW A/C HEATING AND DUCTWORK CORR-CORREC-CALL FOR REINSP WHEN COMPLETED need comb. air to furn/w/h ro check some flex pipes that are smashed over walls in attic.