Inspections for the day of: Thursday, November 8, 2001.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-02188 BLD-Aging Inspection11/8/200111/8/200111/8/2001 12:00:00 AM NR
roof, no call; expires 2-5-02. 11/8/2001 10:05:54 AM
BLD01-01167 BLD-Framing/Rough-in11/6/200111/8/200111/8/2001 12:00:00 AMANR
###-####, complete hd's, recall 11/8/2001 9:55:16 AM
BLD01-00998 BLD-Final11/7/200111/8/200111/8/2001 12:00:00 AMAPASS
###-####, sd's in, rec'd arch's letter...ok per prev. c/n. owner verifies paint to be completed. 11/8/2001 10:30:58 AM
BLD01-02864 BLD-Final11/7/200111/8/200111/8/2001 12:00:00 AMAPASS
###-#### Jake, lot level, clean 11/8/2001 9:54:46 AM
BLD01-02267 BLD-Conference11/8/200111/8/200111/8/2001 12:00:00 AMAPASS
Added by Inspector: 340 On 11/8/2001 9:43:35 AM rec'd revised ftg eng'g; awaiting spec insp reports for welds, fireproofing.
BLD99-03383 BLD-Conference11/8/200111/8/200111/8/2001 12:00:00 AMAPART
Added by Inspector: 340 On 11/8/2001 10:11:26 AM rec'd, reviewed insp reports...soils at west side entry retest ok per mti
BLD00-03729 BLD-Conference11/8/200111/8/200111/8/2001 12:00:00 AMAPASS
Added by Inspector: 340 On 11/8/2001 10:20:01 AM w/ framer & Bruce at site re bsmt corridor; complete firestops at wall to deck.
BLD01-02441 BLD-Final11/8/200111/8/200111/8/2001 12:00:00 AMPPART
JAY ###-#### struct ok pending elec final 11/8/2001 4:50:43 PM
BLD01-02433 BLD-Framing/Rough-in11/8/200111/8/200111/8/2001 12:00:00 AMPPART
Added by Inspector: 340 On 11/8/2001 5:11:20 PM plbg, elec , hvac ok to insul.
BLD00-03721 BLD-Final11/7/200111/8/200111/8/2001 12:00:00 AMPPASS
###-#### JACK, fire ok per 409, l/c issued. 11/8/2001 2:59:01 PM
BLD01-00594 BLD-Framing/Rough-in11/8/200111/8/200111/8/2001 12:00:00 AMPPART
###-#### DAVE keep c/n re fireblocks, chk at dropped clg lines upper floors, ok to insulate. eng'g rec'd re 1st fl walls 11/8/2001 5:01:38 PM
BLD01-01643 BLD-Foundation11/8/200111/8/200111/8/2001 12:00:00 AMPPART
###-#### RICK west side ext footing/frost wall 11/8/2001 2:42:43 PM
BLD01-02756 BLD-Footing11/8/200111/8/200111/8/2001 12:00:00 AMPPART
###-#### ROD bsmt wall & remainder of bsmt ftg. 11/8/2001 3:02:11 PM
BLD01-02864 BLD-Final11/8/200111/8/200111/8/2001 12:00:00 AMPPASS
###-#### DAVE DEMOLITION