Inspections for the day of: Thursday, November 8, 2001.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTom Arcoraci
TitleBLD-COM/RES INSPECTOR
Phone #794-9368
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-02571 BLD-Concrete11/7/200111/8/200111/8/2001 12:00:00 AMAFAIL
jerry- ###-#### no plans 11/8/2001 9:03:34 AM
BLD01-00871 BLD-Foundation11/8/200111/8/200111/8/2001 12:00:00 AMAPASS
###-#### LARRY
BLD01-02653 BLD-Framing/Rough-in11/7/200111/8/200111/8/2001 12:00:00 AMAPART
###-#### or ###-#### Cornell late am ok to side 11/8/2001 1:34:46 PM
BLD01-02035 BLD-Framing/Rough-in11/7/200111/8/200111/8/2001 12:00:00 AMAFAIL
###-#### MIKE CEILING GRID grid fail needs slack wires on light fix 11/8/2001 9:46:15 AM
BLD01-02571 BLD-Footing11/8/200111/8/200111/8/2001 12:00:00 AMAPASS
Added by Inspector: 408 On 11/8/2001 10:07:49 AM
BLD01-00871 BLD-Footing11/8/200111/8/200111/8/2001 12:00:00 AMAPASS
Added by Inspector: 408 On 11/8/2001 12:01:51 PM
BLD01-00379 BLD-Framing/Rough-in11/8/200111/8/200111/8/2001 12:00:00 AMPPART
###-#### CHRIS EXTERIOR SHEER WALL ok ext shear 11/8/2001 2:09:09 PM
MEC01-03352 Pressure Test11/7/200111/8/200111/8/2001 12:00:00 AMPPASS
for pres test-- becky ###-#### --customer will be home after 2:00.thanks
BLD01-02191 BLD-Framing/Rough-in11/8/200111/8/200111/8/2001 12:00:00 AMPNR
SHEER WALL NAILING ###-#### JAY needs app plans and bob a. to meet at job 11/8/2001 3:34:30 PM
BLD01-02864 BLD-Final11/8/200111/8/200111/8/2001 12:00:00 AMPPASS
###-#### DAVE DEMOLITION done by 340 11/8/2001 1:21:59 PM
BLD01-01484 BLD-Framing/Rough-in11/8/200111/8/200111/8/2001 12:00:00 AMPPASS
###-#### ROSS insul ok 11/8/2001 4:05:59 PM
BLD00-02263 BLD-Wall cover11/8/200111/8/200111/8/2001 12:00:00 AMPCANC
Scheduled by a contractor via Hello! on 11/08/2001 at 09:38:09. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 11/08/2001 at 10:46:28.