FIR01-00513
| INSP-Final Inspection | 11/7/2001 | 11/8/2001 | 11/9/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 11/07/2001 at 11:41:18. Contact: ###-####.
|
FIR00-00405
| INSP-Sprinkler Rough-in/Hydro | 11/7/2001 | 11/8/2001 | 11/8/2001 12:00:00 AM | A | PART |
|
|
###-#### RICK basement wet system hydro okay only 11/8/2001 8:28:21 AM
|
FIR00-00565
| INSP-Alarm Testing | 11/7/2001 | 11/8/2001 | 11/8/2001 12:00:00 AM | A | FAIL |
|
|
not ready for testing 11/13/2001 7:09:52 AM
|
FIR01-00265
| INSP-Sprinkler Rough-in/Hydro | 11/8/2001 | 11/8/2001 | 11/8/2001 12:00:00 AM | A | PART |
|
|
Added by Inspector: 409 On 11/8/2001 8:27:54 AM 24 hour air test okay
|