Inspections for the day of: Friday, November 8, 2002.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-02370 BLD-Foundation11/7/200211/8/200211/8/2002 12:00:00 AMAPART
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
BLD02-02358 BLD-Wall cover11/7/200211/8/200211/8/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 11/07/2002 at 11:52:10. Contact: ###-####. c/n on site 11/8/2002 2:35:26 PM
BLD02-00090 BLD-Conference11/7/200211/8/200211/8/2002 12:00:00 AMAFAIL
c/n posted #1 stop drilling holes in p/t deck #2 need engineer or architect of record to submit a plan for drilling the p/t deck #3 need engineer to check three holes that crew may have hit p/t cables in and make recommendations 11/8/2002 2:52:04 PM
BLD00-03414 BLD-Conference11/7/200211/8/200211/8/2002 12:00:00 AMAPASS
for conference extentsion ok to extent permit work in progress 11/8/2002 4:19:10 PM
MEC02-03244 Rough-in11/7/200211/8/200211/8/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 11/07/2002 at 16:03:48. Contact: ###-####. fire place in the inside r/i ok the one on the ext the framing is being changed will need the reinspect after framing is completed 11/8/2002 2:16:38 PM
BLD02-01530 BLD-Final11/7/200211/8/200211/8/2002 12:00:00 AMAPASS
###-#### c.c # 22602 issued 11/8/2002 1:45:25 PM
BLD02-02251 BLD-Framing/Rough-in11/7/200211/8/200211/8/2002 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 11/07/2002 at 17:35:13. Contact: ###-####. needs to instill seal package no inspection done at this time 11/8/2002 4:19:52 PM
BLD02-02505 BLD-Other11/7/200211/8/200211/8/2002 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 11/07/2002 at 17:43:21. Contact: ###-####.shear ok but still need to look at front porch after its framed ext ok to cover 11/8/2002 3:17:18 PM
MEC02-03275 Pressure Test11/8/200211/8/200211/8/2002 12:00:00 AMPCANC
pres test drew cell- ###-#### call 1st before insp
MEC02-03275 Final11/8/200211/8/200211/8/2002 12:00:00 AMPCANC
fn drew ###-#### call 1st before insp
BLD02-02256 BLD-Framing/Rough-in11/8/200211/8/200211/8/2002 12:00:00 AMPFAIL
chris--master set of plans on top of f/p; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie c/n on site ok to insulate 11/8/2002 3:46:23 PM
BLD02-02021 BLD-Framing/Rough-in11/8/200211/8/200211/8/2002 12:00:00 AMPPART
shear contractor had new engineering on front wall all ok per new engineering note new engineering calls for both sides of front shear wall to be sheeted will need to check inside at framing ok to cover ext