FIR06-00645
| INSP-Alarm Testing | 11/7/2006 | 11/8/2006 | 11/8/2006 4:08:23 PM | A | PART |
|
|
Fire alarm at the waiting area only per field inspection by M.Timmerman is acceptable, noted four damper locations with no access provided to visually confirm closure of the vanes.
|
FIR05-00536
| INSP-Sprinkler Rough-in/Hydro | 11/8/2006 | 11/8/2006 | 11/8/2006 4:05:22 PM | P | DONE |
|
|
Duplicate inspection request for an AG hydrostatic test of the 1st floor east wing which passed.
|
FIR06-00628
| INSP-Sprinkler Rough-in/Hydro | 11/7/2006 | 11/8/2006 | 11/8/2006 4:03:43 PM | P | PART |
|
|
AG hydrostatic test of the wet and antifreeze systems are acceptable.
|
MIS06-00287
| FIR-Final | 11/7/2006 | 11/8/2006 | 11/8/2006 4:02:42 PM | A | FAIL |
|
|
Not all emergency lighting has been repaired for functionality as required.
|
FIR06-00558
| INSP-Final Inspection | 11/7/2006 | 11/8/2006 | 11/8/2006 3:08:19 PM | A | PART |
|
|
Fire sprinkler at the waiting area only as previously inspected is acceptable.
|
FIR05-00582
| INSP-Sprinkler Rough-in/Hydro | 11/8/2006 | 11/8/2006 | 11/8/2006 2:48:09 PM | P | PART |
|
|
AG hydrostatic test of the 1st floor east wing system is satisfactory.
|
FIR06-00726
| INSP-Sprinkler Rough-in/Hydro | 11/7/2006 | 11/8/2006 | 11/8/2006 2:17:51 PM | P | PART |
|
|
OH rough-in is acceptable, final pending system tie in, antifreeze fill, valve supervision and signage.
|
BLD06-02225
| FIRE-Conference | 11/8/2006 | 11/8/2006 | 11/8/2006 12:48:03 PM | P | DONE |
|
|
On site confrence to discuss areas lacking adequate fire sprinkler coverage.
|
FIR05-00425
| INSP-Sprinkler Rough-in/Hydro | 11/7/2006 | 11/8/2006 | 11/8/2006 12:33:49 PM | A | PART |
|
|
OH hydrostatic test of the 11th floor is acceptable.
|
FIR06-00808
| INSP-Final Inspection | 11/7/2006 | 11/8/2006 | 11/8/2006 12:05:49 PM | A | CANC |
|
|
No time to complete inspection today.
|
FIR06-00820
| INSP-Final Inspection | 11/1/2006 | 11/8/2006 | 11/8/2006 12:02:21 PM | A | PASS |
|
|
c/n items have been completed, permit finaled.
|
BLD06-03001
| FIRE-Final Inspection | 11/7/2006 | 11/8/2006 | 11/8/2006 11:41:42 AM | A | PASS |
|
|
Fire life safety inspection passed.
|
BLD06-01480
| FIRE-Final Inspection | 11/7/2006 | 11/8/2006 | 11/8/2006 11:12:22 AM | A | PASS |
|
|
Inspection passed, tenant to mount the provided fire extinguisher on the wall as discussed for compliance prior to structural final.
|
FIR06-00605
| INSP-Final Inspection | 11/8/2006 | 11/8/2006 | 11/8/2006 10:45:08 AM | P | FAIL |
|
|
Need to provide method for locking or sealing the control valves at the backflow in the open position, also need to provide signage at the control valves indicating thier function, see fire code review notes for requirements.
|
BLD05-03335
| FIRE-Final Inspection | 11/7/2006 | 11/8/2006 | 11/8/2006 10:39:57 AM | A | FAIL |
|
|
Project related fire sprinkler permit failed final inspection.
|
FIR06-00795
| INSP-Final Inspection | 11/7/2006 | 11/8/2006 | 11/8/2006 10:37:07 AM | A | PASS |
|
|
Fire alarm work is acceptable, permit finaled.
|
FIR06-00794
| INSP-Final Inspection | 11/7/2006 | 11/8/2006 | 11/8/2006 10:36:31 AM | A | PASS |
|
|
Fire alarm work passed final inspection.
|
FIR06-00793
| INSP-Final Inspection | 11/7/2006 | 11/8/2006 | 11/8/2006 10:35:59 AM | A | PASS |
|
|
Fire alarm work passed final inspection.
|
BLD05-03105
| FIRE-Final Inspection | 11/7/2006 | 11/8/2006 | 11/8/2006 10:35:29 AM | A | PASS |
|
|
Shell fire life safety inspection is acceptable pending the installation of a visual indicator at the main entry/exit door at the 1st floor lobby south.
|
FIR06-00168
| INSP-Final Inspection | 11/8/2006 | 11/8/2006 | 11/8/2006 10:33:21 AM | P | PASS |
|
|
UG fire supply line permit finaled.
|
FIR06-00087
| FIR-Aging Inspection | 11/8/2006 | 11/8/2006 | 11/8/2006 8:24:32 AM | | DEFR |
|
|
|