Inspections for the day of: Thursday, November 8, 2012.
Number of inspections: 18
Percentage of inspections complete: 94 %
Percentage of inspections not complete: 6 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD11-00397 BLD-Conference10/31/201211/1/2012 P 
Status? Remaining requirements and time frame for completion?
BLD12-01193 BLD-Final11/8/201211/8/201211/8/2012 4:45:50 PMPPASS
gaurd rail is now solid steel sheetmetal pannels if they go back to a cable rail system they will need to repermit and run though plan reveiw
BLD12-01663 BLD-Conference11/7/201211/8/201211/8/2012 4:42:41 PMPPASS
>> Inspection requested via web by Stephanie White
BLD12-01663 DOC - Permit Finaled11/8/201211/8/201211/8/2012 4:42:29 PMPPASS
GCB12-00123 GCB-Framing11/8/201211/8/201211/8/2012 4:42:06 PMPPASS
Todd @ ###-####
GCB12-00135 GCB-Fndatn/slab ins/fld vent11/8/201211/8/201211/8/2012 4:40:37 PMPPASS
Rick @ ###-####
MFH Setup
MIS12-00310 BLD-Conference11/8/201211/8/201211/8/2012 2:46:29 PMPPASS
Complaint already poured concrete for storage shed right on property line to 610 14th St. and plans on expanding existing garage for church. No permits found. shed will be under 200 sq/ft no bld requiered
BLD12-02169 BLD-Wall Bracing11/8/201211/8/201211/8/2012 1:50:47 PMPPART
Joey Phone #: ###-#### second floor ok to cover ext walls
BLD12-02773 BLD-Footing11/7/201211/8/201211/8/2012 1:50:04 PMPPASS
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
ESC11-00889 Site Final11/8/201211/8/201211/8/2012 12:57:10 PMPPASS
ESC11-00889 DOC - Permit Finaled11/8/201211/8/201211/8/2012 12:56:54 PMPPASS
BLD11-02960 BLD-Final11/7/201211/8/201211/8/2012 11:24:01 AMAFAIL
Dave Kelley Phone #: ###-#### needs handrail off deck stairs and returns on hand rails in house
BLD12-01193 BLD-Final11/8/201211/8/201211/8/2012 9:59:26 AMAPART
ok for temp occ needs engineering and signoffs on cable gaurdrail contractor has temp secured with sheet metal
ESC11-00517 Site Final11/8/201211/8/201211/8/2012 9:56:34 AMAPASS
BLD11-01695 BLD-Final11/8/201211/8/201211/8/2012 9:55:04 AMAPASS
BLD12-01467 BLD-Final11/7/201211/8/201211/8/2012 9:53:59 AMANR
Robert Phone #: ###-#### needs a zoning final first
BLD12-02750 BLD-Final11/7/201211/8/201211/8/2012 9:45:29 AMAPASS
David--Please call with results Phone #: ###-####
BLD12-02834 BLD-Foundation11/7/201211/8/201211/8/2012 9:25:43 AMAPASS
chris Phone #: ###-####