Inspections for the day of: Friday, November 8, 2013.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRock A. Hudson
TitleELE-INSPECTOR
Phone #794-6794
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE12-00762 ELE-Aging Inspection11/8/201311/8/201311/8/2013 4:21:56 PM DONE
Waiting on owner
ELE12-00804 ELE-Aging Inspection11/8/201311/8/201311/8/2013 4:01:40 PM DONE
Waiting on owner
ELE13-02874 Electrical Rough-In11/6/201311/8/201311/8/2013 3:46:53 PMPPASS
Don Phone #: ###-#### wall and ceiling rough in ok cover
ELE13-02057 Electrical Rough-In11/8/201311/8/201311/8/2013 3:02:00 PMPPASS
Trench back fill. Phone #: ###-#### >> Inspection requested via web by Buster Bowen Fire pump underground west and north rough in ok cover
ELE13-02469 Electrical Rough-In11/8/201311/8/201311/8/2013 2:21:12 PMPPASS
###-#### all walls complete. Rough in ok cover
ELE13-03133 Electrical Rough-In11/7/201311/8/201311/8/2013 1:37:07 PMPPASS
turn on haines off of warm springs. go to hays and turn right. on the left side of the road up hill. Phone #: ###-#### >> Inspection requested via web by Brian Hughes Rough in ok cover
ELE13-02968 Electrical Rough-In11/8/201311/8/201311/8/2013 1:24:21 PMPPASS
This rough in is ONLY for a heated tile floor in the master bathroom. Phone #: ###-#### >> Inspection requested via web by Rhonda Zamagni Floor heat box and raceway rough in ok cover
ELE13-03133 Permanent Service11/8/201311/8/201311/8/2013 1:24:10 PMPPASS
turn on haines off of warm springs. go to hays and turn right. on the left side of the road up hill. Phone #: ###-#### >> Inspection requested via web by Brian Hughes p/s o/h n ok
ELE13-03124 Electrical Rough-In11/7/201311/8/201311/8/2013 12:54:01 PMAPASS
Master bed and bath remodel. Phone #: ###-#### >> Inspection requested via web by shane vigil Rough in ok cover
ELE13-03128 Final11/8/201311/8/201311/8/2013 12:53:21 PMAPASS
Inspection anytime time today is fine. New surface mount outlet for water feature is on the right side (outside) of house. Thank you! Phone #: ###-#### >> Inspection requested via web by Adam Staigle Final ok
ELE13-03128 Electrical Rough-In11/8/201311/8/201311/8/2013 12:52:59 PMPPASS
Inspection anytime time today is fine. New surface mount outlet for water feature is on the right side (outside) of house. Thank you! Phone #: ###-#### >> Inspection requested via web by Adam Staigle Rough in ok
ELE13-02791 Conference11/7/201311/8/201311/8/2013 10:19:31 AMADONE
Requesting a consultation for the Woodland Empire project. Call Rod Tomlinson with any questions. Phone #: ###-#### >> Inspection requested via web by Clint Tate Discussed overhead service riser clearance over alley and location of disconnecting means. Water pipe feeding building is non metallic.
ELE12-01694 Final11/7/201311/8/201311/8/2013 9:44:05 AMAFAIL
Jason Timmons (contractor) will meet you there. It is just an inspection on the kitchen. Phone #: ###-#### >> Inspection requested via web by Craig Korell 110.3- Installation not complete. Bare NM cable hanging for light in entry. 2 receptical outlets not working in nook and breaker blanks needed.
ELE13-02011 Final11/8/201311/8/201311/8/2013 9:23:57 AMPPASS
Phone #: ###-#### >> Inspection requested via web by Heath Thomas Contractor stated pancake box used on out front entry light. Final ok
ELE13-03070 Final11/7/201311/8/201311/8/2013 9:12:43 AMAFAIL
Phone #: ###-#### >> Inspection requested via web by steve ragan 250.24- The grounding electrode conductor shall terminate at the same terminal or bus bar as the grounded conductor
GCE13-00066 GCE-Final11/7/201311/8/201311/8/2013 8:59:09 AMAPASS
Tim ###-#### Final ok
GCE13-00185 GCE-Final11/7/201311/8/201311/8/2013 8:40:03 AMAPASS
Robert ###-#### Heat pump final ok