Inspections for the day of: Friday, November 8, 2013.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR13-00627 INSP-Final Inspection11/8/201311/8/201311/8/2013 5:10:53 PMPPART
Fire sprinkler work okayed for cover- Note* missing retaining strap at the beam clamp to the new armover.
BLD13-03060 FIRE-Final Inspection11/7/201311/8/201311/8/2013 5:08:15 PMAPASS
Fire life safety okayed pending removal of the manual thumbturn at the west main entry door and repair of the occupant sensor- *To be verified at structural final per agreement.
BLD13-02815 FIRE-Final Inspection11/8/201311/8/201311/8/2013 2:22:41 PMPPASS
Inspection passed per conditions indicated on permit documents.
FIR13-00606 INSP-Final Inspection11/8/201311/8/201311/8/2013 2:20:49 PMPPASS
Fire alarm work passed inspection. Permit final approved.
FIR13-00579 INSP-Sprinkler Rough-in11/7/201311/8/201311/8/2013 2:02:33 PMAPART
Rough-in inspection completed for work at the 2nd floor guest rooms- okayed for ceiling cover.
BLD13-00839 FIRE-Conference11/7/201311/8/201311/8/2013 1:59:26 PMADONE
On site conference with contractor regarding conditions for fire life safety and occupancy approval. Discussed fire code review note items, project schedule, hood permit, etc.
FIR13-00621 INSP-Conference11/7/201311/8/201311/8/2013 1:56:26 PMADONE
Regarding MP location for the hood suppression system.
FIR13-00325 INSP-Final Inspection11/7/201311/8/201311/8/2013 1:55:33 PMAPASS
Fire alarm work passed site inspection and functional testing. Permit finaled.