BLD13-02364
| BLD-Footing | 11/8/2013 | 11/8/2013 | 11/10/2013 2:07:32 PM | P | PART |
|
|
adam Phone #: ###-####,, work in progress,, ok to pour when ready
|
MIS10-00242
| MIS-Aging Inspection | 11/8/2013 | 11/8/2013 | 11/8/2013 4:13:55 PM | | PEND |
|
|
|
BLD13-02242
| BLD-Final | 11/7/2013 | 11/8/2013 | 11/8/2013 4:13:35 PM | A | NR |
|
|
Thomas Phone #: ###-####
|
BLD13-01589
| BLD-Final | 11/5/2013 | 11/8/2013 | 11/8/2013 4:11:09 PM | P | PASS |
|
|
JERRY PLEASE CALL BEFORE GOING OUT Phone #: ###-####
|
BLD13-01589
| DOC - Permit Finaled | 11/8/2013 | 11/8/2013 | 11/8/2013 4:10:11 PM | P | PASS |
|
|
signed paper
|
BLD13-01541
| BLD-Framing/Rough-in | 11/7/2013 | 11/8/2013 | 11/8/2013 4:08:48 PM | P | PART |
|
|
Mike Mitchell Phone #: ###-####,, walk though only,, roof connections ok,, straps ok,, parapets ok
|
BLD13-02185
| BLD-Energy code compliance | 11/7/2013 | 11/8/2013 | 11/8/2013 3:39:19 PM | P | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Dan Geis
|
BLD13-01541
| BLD-Wall Bracing | 11/7/2013 | 11/8/2013 | 11/8/2013 3:33:20 PM | P | PASS |
|
|
Mike Mitchell Phone #: ###-####,, exterior ok
|
BLD13-02672
| BLD-Foundation | 11/7/2013 | 11/8/2013 | 11/8/2013 12:48:17 PM | A | PASS |
|
|
adam Phone #: ###-####
|
BLD13-01126
| BLD-Framing/Rough-in | 11/6/2013 | 11/8/2013 | 11/8/2013 12:46:18 PM | A | PEND |
|
|
MICHAEL PLEASE CALL 20 MIN BEFORE Phone #: ###-####,, conf only,, need plumbing rough pass 1st
|
GCB13-00132
| GCB-Framing | 11/7/2013 | 11/8/2013 | 11/8/2013 12:42:49 PM | A | PART |
|
|
Chad ###-####,, correction posted,, need to verify electrical and mechanical prior to isulation,, provide added changes to plan as built for records
|
GCB12-00156
| GCB-Footing | 11/7/2013 | 11/8/2013 | 11/8/2013 11:34:52 AM | A | PART |
|
|
Herb ###-####,, work in progress,, special inspector on site,, back (south footing)
|