FIR13-00571
| INSP-Sprinkler Rough-in | 11/7/2013 | 11/8/2013 | 11/8/2013 3:41:48 PM | P | PASS |
|
|
Rough-in passed. Piping is ok to cover.
|
FIR13-00441
| INSP-Final Inspection | 11/7/2013 | 11/8/2013 | 11/8/2013 3:37:51 PM | P | FAIL |
|
|
Tyco heads have been installed instead of the submitted Viking, provide one additional brace at the end of the 4" main and provide letter from manufacturer to support the installation of the hangers from the bottom of the z purlins.
|
BLD13-00440
| FIRE-Final Inspection | 11/7/2013 | 11/8/2013 | 11/8/2013 2:32:20 PM | P | PASS |
|
|
Life safety passed
|
FIR13-00584
| INSP-Final Inspection | 11/7/2013 | 11/8/2013 | 11/8/2013 2:30:07 PM | P | PASS |
|
|
Permit finaled
|
FIR13-00598
| INSP-Final Inspection | 11/8/2013 | 11/8/2013 | 11/8/2013 1:39:26 PM | P | PASS |
|
|
Permit finaled
|
BLD13-01578
| FIRE-Final Inspection | 11/7/2013 | 11/8/2013 | 11/8/2013 1:37:36 PM | A | PASS |
|
|
Life safety passed
|
BLD13-02948
| FIRE-Final Inspection | 11/7/2013 | 11/8/2013 | 11/8/2013 12:39:04 PM | A | FAIL |
|
|
I let Nate know that per Jason Blais the exit sign/emergency lights, hardware at the new double doors and the exterior stairs would need to be completed prior to a temporary occupancy approval for the warehouse area could be given. Phone #: ###-####
|
FIR13-00617
| INSP-Final Inspection | 11/7/2013 | 11/8/2013 | 11/8/2013 11:44:46 AM | A | PASS |
|
|
Permit finaled
|
FIR08-00550
| INSP-Final Inspection | 11/7/2013 | 11/8/2013 | 11/8/2013 11:27:27 AM | A | FAIL |
|
|
Began inspection by verifying the sync of the audio/visual devices. When testing the horns on most of the first floor and the west half of the second floor failed to work. Inspection stopped and no devices tested.
|
BLD13-01024
| FIRE-Final Inspection | 11/7/2013 | 11/8/2013 | 11/8/2013 9:20:31 AM | A | PASS |
|
|
life safety passed
|
FIR13-00581
| INSP-Final Inspection | 11/1/2013 | 11/8/2013 | 11/8/2013 8:37:24 AM | A | CANC |
|
|
tim will reschedule this for next week since he can't make it there when I can be there
|
FIR13-00596
| INSP-Final Inspection | 11/7/2013 | 11/8/2013 | 11/8/2013 8:36:15 AM | A | PASS |
|
|
Permit finaled
|
FIR13-00576
| INSP-Conference | 11/7/2013 | 11/8/2013 | 11/8/2013 7:43:13 AM | A | DONE |
|
|
Construction at front entry has changed to combustible. I agreed that a single upright head and as-builts showing this addition would suffice. I noted that four way bracing will be required at the top of the main piping at the risers above the restrooms.
|