BLD13-01539
| BLD-Other | 10/31/2013 | 11/1/2013 | | P | |
|
|
rebar on a slab // charles Phone #: ###-####
|
BLD13-01688
| BLD-Framing/Rough-in | 11/1/2013 | 11/1/2013 | | P | |
|
|
Charles Phone #: ###-####
|
BLD13-02159
| BLD-Framing/Rough-in | 11/7/2013 | 11/8/2013 | 11/8/2013 3:14:02 PM | P | PASS |
|
|
Framing for 1hr. exit corridor.
|
BLD13-01024
| BLD-Final | 11/7/2013 | 11/8/2013 | 11/8/2013 3:13:08 PM | P | PASS |
|
|
Victoria Phone #: ###-####
|
BLD13-01024
| DOC - Permit Finaled | 11/8/2013 | 11/8/2013 | 11/8/2013 3:12:58 PM | P | PASS |
|
|
|
BLD13-00933
| BLD-Final | 11/7/2013 | 11/8/2013 | 11/8/2013 3:12:45 PM | P | PASS |
|
|
Victoria Phone #: ###-####. ok for perm occ.
|
GCB12-00130
| GCB-Final | 11/7/2013 | 11/8/2013 | 11/8/2013 11:21:02 AM | A | PASS |
|
|
Robert ###-#### call first. Structural final only ok.
|
BLD13-01289
| BLD-Wall cover | 11/7/2013 | 11/8/2013 | 11/8/2013 11:04:17 AM | A | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Mike McHargue. 1st and 2nd floor north end units ok for tape. 3rd floor central units ok for tape.
|
BLD13-00335
| BLD-Framing/Rough-in | 11/6/2013 | 11/8/2013 | 11/8/2013 9:33:51 AM | A | PART |
|
|
Mike. Please give me 15 minutes notice so I can meet you on site to also review the shear and the same time. I was out of town for a funeral for a while. Thanks Scott Phone #: ###-#### >> Inspection requested via web by Scott Zierler. Provide erpair for C7 girder truss, Strap double top plates in garage. Contractor also provided engineering for largerwindow at rear of home for wall bracing issues ok. ok to insulate.
|
BLD13-01876
| BLD-Framing/Rough-in | 11/7/2013 | 11/8/2013 | 11/8/2013 9:13:05 AM | P | CANC |
|
|
greg Phone #: ###-#### Inspection cancelled from web by: Barbara Stitt
|