FIR16-00712
| INSP-Sprinkler Rough-in | 11/8/2016 | 11/8/2016 | 11/8/2016 2:52:55 PM | P | PASS |
|
|
Todays inspection was just for the IBR which is approved for cover. I let the general contractor know that it appears to barely meet he minimum 4'-6" bury depth and that the remaining piping would be better buried alittle deeper. He agreed.
|
FIR16-00692
| INSP-Sprinkler Rough-in | 11/8/2016 | 11/8/2016 | 11/8/2016 1:49:55 PM | P | CANC |
|
|
Supply line cover passed
|
FIR16-00693
| INSP-Sprinkler Rough-in | 11/8/2016 | 11/8/2016 | 11/8/2016 1:49:42 PM | P | PASS |
|
|
Supply line cover passed
|
BLD16-01662
| FIRE-Final Inspection | 11/8/2016 | 11/8/2016 | 11/8/2016 1:49:16 PM | P | FAIL |
|
|
Provide fire dept approval of the operation of the Opticon system at the main entry gate. All other items appear ok.
|
BLD16-01665
| FIRE-Final Inspection | 11/8/2016 | 11/8/2016 | 11/8/2016 1:35:32 PM | P | FAIL |
|
|
Provide fire dept approval of the operation of the Opticon system at the main entry gate. All other items appear ok.
|
BLD16-01663
| FIRE-Final Inspection | 11/8/2016 | 11/8/2016 | 11/8/2016 1:35:14 PM | P | FAIL |
|
|
Provide fire dept approval of the operation of the Opticon system at the main entry gate. All other items appear ok.
|
BLD16-01664
| FIRE-Final Inspection | 11/8/2016 | 11/8/2016 | 11/8/2016 1:34:49 PM | P | FAIL |
|
|
Provide fire dept approval of the operation of the Opticon system at the main entry gate. All other items appear ok.
|
BLD16-01660
| FIRE-Final Inspection | 11/8/2016 | 11/8/2016 | 11/8/2016 1:34:24 PM | P | FAIL |
|
|
Provide fire dept approval of the operation of the Opticon system at the main entry gate. All other items appear ok.
|
BLD16-01661
| FIRE-Final Inspection | 11/8/2016 | 11/8/2016 | 11/8/2016 1:33:48 PM | P | FAIL |
|
|
Provide fire dept approval of the operation of the Opticon system at the main entry gate, provide fire extinguishers, exit signs, emergency lighting and exit discharge lighting as per the city approved plans.
|
FIR16-00547
| INSP-Final Inspection | 11/7/2016 | 11/8/2016 | 11/8/2016 12:50:55 PM | P | CANC |
|
|
To be canceled per Dave Phone #: ###-####
|
FIR16-00101
| INSP-Sprinkler Rough-in | 11/7/2016 | 11/8/2016 | 11/8/2016 9:19:07 AM | P | CANC |
|
|
Tyler Miller is the contact for this inspection. He needs a rough to cover inspection of 3 units on the 4th floor. Thank you Phone #: ###-#### Inspection requested via web by Stan Beus
|
BLD16-01367
| FIRE-Final Inspection | 11/7/2016 | 11/8/2016 | 11/8/2016 8:44:53 AM | A | FAIL |
|
|
Repair emergency light in corridor, provide tagged and mounted fire extinguisher, remove storage in the back corridor that blocks the exit.
|
FIR16-00453
| INSP-Alarm Testing | 11/7/2016 | 11/8/2016 | 11/8/2016 7:58:52 AM | A | FAIL |
|
|
Store employee did not show up at the agreed time to allow access to the store. No inspection performed.
We will be ready for our inspection at 7:30am per our conversation on Friday the 4th. Barney Sanders will make sure all RTU''s are running.
Thank you, Phone #: ###-#### Inspection requested via web by Josiah Monett
|