ELE17-03661
| Rough-In Permanent Service | 11/8/2017 | 11/8/2017 | 11/8/2017 3:42:30 PM | P | PASS |
|
|
please call 30-60 min before // Thomas Phone #: ###-#### Check attic for junction boxes for covers. Bath wiring has not been replaced. no 20 amp dedicated. Kitchen, laundry, beds living rm, rough in ok cover p/s o/h rec ok
|
ELE16-04017
| Electrical Rough-In | 11/8/2017 | 11/8/2017 | 11/8/2017 2:55:09 PM | P | PASS |
|
|
STR B Landings Phone #: ###-#### Inspection requested via web by Debby Pierce Rough in for stair B pour rough in ok cover
|
MIS17-00380
| ELE-Conference | 11/8/2017 | 11/8/2017 | 11/8/2017 2:06:19 PM | P | FAIL |
|
|
Inspecting work for ELE17-03782 and noticed 2 flexible cords had been added to a panel off kitchen. Flexible cords leave panel and are run above grid to location unknown. Jen Davis (Training General manager) ###-#### has been informed of violation and instructed to hire electrical contractor to permit work to replace flexible cords in violation with: NEC 400.12(1)- Flexible cords shall not be used as a substitute for building wiring. NEC 400.12 (2)- Flexible cords shall not be run above structural or drop ceilings.
|
ELE17-03782
| Final | 11/8/2017 | 11/8/2017 | 11/8/2017 1:53:18 PM | P | PASS |
|
|
Inspection for Buffalo Wild Wings power re-routed to HVAC units. Please call prior to arrival for access to kitchen area. Phone #: ###-#### Inspection requested via web by Kevin Perez Final ok
|
ELE17-03782
| Electrical Rough-In | 11/8/2017 | 11/8/2017 | 11/8/2017 1:51:05 PM | P | PASS |
|
|
Inspection for Buffalo Wild Wings power re-routed to HVAC units. Please call prior to arrival for access to kitchen area. Phone #: ###-#### Inspection requested via web by Kevin Perez Re-routed power to HVAC units rough in ok
|
ELE17-02313
| Final | 11/8/2017 | 11/8/2017 | 11/8/2017 1:20:24 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Emmet Bushman Final ok
|
ELE17-02482
| Electrical Rough-In | 11/7/2017 | 11/8/2017 | 11/8/2017 12:42:27 PM | P | PASS |
|
|
Floor heat in 2 bathrooms Insp. Phone #: ###-#### Inspection requested via web by John VanZandt Upstairs bath and master bath floor heat rough in ok cover
|
ELE17-02544
| Final | 11/8/2017 | 11/8/2017 | 11/8/2017 11:35:35 AM | P | PASS |
|
|
garage code 1524 Phone #: ###-#### Inspection requested via web by Darryn Coburn Receptacle located under window behind decorative trim. Large hole cut in trim work to expose receptacle and trimed to drywall at time of final. Final ok
|
ELE17-03761
| Rough-In Permanent Service | 11/7/2017 | 11/8/2017 | 11/8/2017 11:11:30 AM | A | CANC |
|
|
detached garage wiring....thanks!! Phone #: ###-#### Inspection requested via web by Richard Gratiot Needed rough in only garage fed from house
|
ELE17-03761
| Electrical Rough-In | 11/8/2017 | 11/8/2017 | 11/8/2017 11:10:52 AM | P | PASS |
|
|
detached garage wiring....thanks!! Phone #: ###-#### Inspection requested via web by Richard Gratiot Garage panel hot and fed from house. Rough in ok cover
|
ELE15-04066
| Final | 11/7/2017 | 11/8/2017 | 11/8/2017 10:19:13 AM | A | PASS |
|
|
Aging Phone #: ###-#### Inspection requested via web by Steve VanWinkle Final ok
|
ELE15-04066
| Electrical Rough-In | 11/8/2017 | 11/8/2017 | 11/8/2017 9:48:32 AM | P | PASS |
|
|
Aging Phone #: ###-#### Inspection requested via web by Steve VanWinkle Listing confirmed rough in ok
|
ELE17-03530
| Electrical Rough-In | 11/7/2017 | 11/8/2017 | 11/8/2017 9:47:37 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Mark M 1st floor BMT palliative care grid rough in ok cover
|
ELE17-03439
| Electrical Rough-In | 11/7/2017 | 11/8/2017 | 11/8/2017 9:13:11 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by sam petterson Walls and hardlid rough in ok cover
|