FIR17-00198
| INSP-Supply line flush | 11/8/2017 | 11/8/2017 | 11/8/2017 2:37:43 PM | P | PASS |
|
|
Underground flush passed.
|
FIR17-00617
| INSP-Sprinkler Rough-in/Hydro | 11/8/2017 | 11/8/2017 | 11/8/2017 2:14:55 PM | P | PASS |
|
|
Underground hydro test passed
Troy Phone #: ###-####
|
BLD16-04463
| FIRE-Final Inspection | 11/7/2017 | 11/8/2017 | 11/8/2017 1:58:52 PM | P | FAIL |
|
|
Add the exit sign as shown, repair teh other exit sign, remove the expired fire extinguisher and provide verification of the emergency lights as per discussion and as shown on the approved plans.
|
FIR17-00567
| INSP-Final Inspection | 11/3/2017 | 11/8/2017 | 11/8/2017 1:10:05 PM | A | PASS |
|
|
Permit finaled.
Ashley Phone #: ###-####
|
BLD17-04051
| FIRE-Final Inspection | 11/7/2017 | 11/8/2017 | 11/8/2017 11:44:27 AM | A | PASS |
|
|
life safety passed
Call half hour before // Ryan Phone #: ###-####
|
FIR17-00638
| INSP-Sprinkler Rough-in | 11/7/2017 | 11/8/2017 | 11/8/2017 10:56:25 AM | A | PASS |
|
|
See the city approved plans for the room with the single pendant head that is ok for cover.
|
BLD17-00467
| FIRE-Final Inspection | 11/7/2017 | 11/8/2017 | 11/8/2017 10:12:31 AM | A | FAIL |
|
|
No city approved plans or small documents on site. No real inspection was performed. I spoke to the contractor about the requirement for the Opticon system at the facility gates, fire extinguishers, addressing of the buildings (A, B, C...ect)K
eever Phone #: ###-####
|
BLD17-00477
| FIRE-Final Inspection | 11/7/2017 | 11/8/2017 | 11/8/2017 10:12:00 AM | A | FAIL |
|
|
No city approved plans or small documents on site. No real inspection was performed. I spoke to the contractor about the requirement for the Opticon system at the facility gates, fire extinguishers, addressing of the buildings (A, B, C...ect)
Keever Phone #: ###-####
|
BLD17-00466
| FIRE-Final Inspection | 11/7/2017 | 11/8/2017 | 11/8/2017 10:11:11 AM | A | FAIL |
|
|
No city approved plans or small documents on site. No real inspection was performed. I spoke to the contractor about the requirement for the Opticon system at the facility gates, fire extinguishers, addressing of the buildings (A, B, C...ect)
Keever Phone #: ###-####
|
FIR17-00522
| INSP-Sprinkler Rough-in | 11/7/2017 | 11/8/2017 | 11/8/2017 10:01:22 AM | A | PASS |
|
|
Partial first floor rooms rough-in passed. See the city approved plans for branchlines marked "ok" at the ends that have been inspected. These lines can be covered. The mains down the corridor has not been installed
Phone #: ###-#### Inspection requested via web by Matthew Lewis
|
FIR17-00522
| INSP-Supply line flush | 11/7/2017 | 11/8/2017 | 11/8/2017 9:58:00 AM | A | CANC |
|
|
Wrong permit number scheduled
|