Inspections for the day of: Wednesday, November 8, 2017.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR17-00198 INSP-Supply line flush11/8/201711/8/201711/8/2017 2:37:43 PMPPASS
Underground flush passed.
FIR17-00617 INSP-Sprinkler Rough-in/Hydro11/8/201711/8/201711/8/2017 2:14:55 PMPPASS
Underground hydro test passed

Troy Phone #: ###-####
BLD16-04463 FIRE-Final Inspection11/7/201711/8/201711/8/2017 1:58:52 PMPFAIL
Add the exit sign as shown, repair teh other exit sign, remove the expired fire extinguisher and provide verification of the emergency lights as per discussion and as shown on the approved plans.
FIR17-00567 INSP-Final Inspection11/3/201711/8/201711/8/2017 1:10:05 PMAPASS
Permit finaled.

Ashley Phone #: ###-####
BLD17-04051 FIRE-Final Inspection11/7/201711/8/201711/8/2017 11:44:27 AMAPASS
life safety passed

Call half hour before // Ryan Phone #: ###-####
FIR17-00638 INSP-Sprinkler Rough-in11/7/201711/8/201711/8/2017 10:56:25 AMAPASS
See the city approved plans for the room with the single pendant head that is ok for cover.
BLD17-00467 FIRE-Final Inspection11/7/201711/8/201711/8/2017 10:12:31 AMAFAIL
No city approved plans or small documents on site. No real inspection was performed. I spoke to the contractor about the requirement for the Opticon system at the facility gates, fire extinguishers, addressing of the buildings (A, B, C...ect)K

eever Phone #: ###-####
BLD17-00477 FIRE-Final Inspection11/7/201711/8/201711/8/2017 10:12:00 AMAFAIL
No city approved plans or small documents on site. No real inspection was performed. I spoke to the contractor about the requirement for the Opticon system at the facility gates, fire extinguishers, addressing of the buildings (A, B, C...ect)

Keever Phone #: ###-####
BLD17-00466 FIRE-Final Inspection11/7/201711/8/201711/8/2017 10:11:11 AMAFAIL
No city approved plans or small documents on site. No real inspection was performed. I spoke to the contractor about the requirement for the Opticon system at the facility gates, fire extinguishers, addressing of the buildings (A, B, C...ect)

Keever Phone #: ###-####
FIR17-00522 INSP-Sprinkler Rough-in11/7/201711/8/201711/8/2017 10:01:22 AMAPASS
Partial first floor rooms rough-in passed. See the city approved plans for branchlines marked "ok" at the ends that have been inspected. These lines can be covered. The mains down the corridor has not been installed

Phone #: ###-#### Inspection requested via web by Matthew Lewis
FIR17-00522 INSP-Supply line flush11/7/201711/8/201711/8/2017 9:58:00 AMACANC
Wrong permit number scheduled