Inspections for the day of: Friday, November 8, 2019.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTom Saunders
TitleELE-INSPECTOR
Phone #208-794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE17-03787 ELE-Aging Inspection11/8/201911/8/201911/8/2019 3:34:32 PM PASS
DOC permit expired
ELE17-03787 DOC - Permit Expired11/8/201911/8/201911/8/2019 3:34:11 PMPPASS
no activity over 180 days
ELE19-04114 Permanent Service11/8/201911/8/201911/8/2019 3:32:41 PMPPASS
Pad has been poured. There weren''t any breakers installed above 6''7" but now there isn''t any bussing above that either. Phone #: ###-#### Inspection requested via web by Dan Jennings...
p/s u/g new ok
ELE19-04113 Permanent Service11/8/201911/8/201911/8/2019 3:32:14 PMPPASS
Pad has been poured. There weren''t any breakers installed above 6''7" but now there isn''t any bussing above that either. Phone #: ###-#### Inspection requested via web by Dan Jennings...
ps u/g new ok
ELE19-03687 Conference11/8/201911/8/201911/8/2019 3:29:14 PMPPASS
Shawn Phone #: ###-####...2nd conference discussing moving location of service...pamphlet given
ELE19-02678 Final11/7/201911/8/201911/8/2019 1:36:02 PMPPASS
Phone #: ###-#### Inspection requested via web by jamie berg...ok to final
ELE19-04293 Permanent Service11/8/201911/8/201911/8/2019 12:57:29 PMPPASS
It is all outside. If you have any questions please feel free to contact Jason ###-####. Thanks!! Phone #: ###-#### Inspection requested via web by Clayton Morgan...
rough of circuits to complete service change for final will rquire future inspection
p/s o/h ok to move to new location
ELE19-04175 Electrical Rough-In11/8/201911/8/201911/8/2019 12:06:20 PMAPASS
Everything but storefront Phone #: ###-#### Inspection requested via web by Bryan McLaughlin...ok to cover walls, counter, and hard lid main area minus area noted...wall outlets to be fished in future
ELE19-02905 Final11/7/201911/8/201911/8/2019 10:58:41 AMAPASS
Nick Harris is contact at ###-####. Phone #: ###-#### Inspection requested via web by Debby Pierce...job complete...above ground visible wiring...walked thru building..shown scope of job...all labelling verified....ok to final
ELE19-03774 Final11/7/201911/8/201911/8/2019 10:11:28 AMAPASS
call 4805933850 for Karl Phone #: ###-#### Inspection requested via web by Coulton Main...
labelling, disconnect, and OCPD ok
ELE19-03774 Electrical Rough-In11/8/201911/8/201911/8/2019 10:10:38 AMAPASS
call 4805933850 for Karl Phone #: ###-#### Inspection requested via web by Coulton Main...
UL listing verified
panels removed to ground
ELE19-03104 Final11/7/201911/8/201911/8/2019 9:47:12 AMAPASS
Please call Luke with any questions Phone #: ###-#### Inspection requested via web by Kevin Perez...ok to final
ELE19-04192 Electrical Rough-In11/8/201911/8/201911/8/2019 9:24:55 AMPPASS
Scheduled wrong inspection earlier... sorry about that! Phone #: ###-#### Inspection requested via web by Matt Oranday...done AM
ELE19-04192 Electrical Rough-In11/8/201911/8/201911/8/2019 9:22:35 AMAPASS
We will be onsite around 8:30 with materials
Phone #: ###-#### Inspection requested via web by Matt Oranday...UL listed equipment verified
ELE19-04192 Final11/7/201911/8/201911/8/2019 9:06:19 AMACANC
We will be onsite around 8:30 with materials
Phone #: ###-#### Inspection requested via web by Matt Oranday...wrong inspection scheduled...should have been rough-in...inspection changed
ELE19-04318 Electrical Rough-In11/8/201911/8/201911/8/2019 8:39:58 AMAPASS
uffer and sprinkler bond...
2/0 for sprinkler and rebar for uffer...ok
ELE19-04200 Final11/4/201911/8/201911/7/2019 6:18:26 PMPCANC
I am installing a 200 amp main breaker, I will have the power disconnected at 9:30 AM and will to be done around 4:30 pm. Can I get an inspection around 4:30 friday to get the power turned back on before the weekend? Phone #: ###-#### >> Inspection requested via web by david Macdoanld Inspection cancelled from web by: david Macdoanld